Forum quick links
UL Product Lens - any USGBC issued acceptance/precedent?
CI-v4 MRc5:Building product disclosure and optimization - material ingredientsposted by Joanna Switzer on
Hi all, Rumor has it "UL Product Lens" evaluated products qualify for Ingredients Reporting, Option 1.
Exterior lighting for group certification
NC-2009 SSc8:Light Pollution Reductionposted by Mohamed M. Abd Elhameed on
I am currently working on a project with multiple buildings within the LEED boundary. The project will follow group approach registration via campus guidance.
Stormwater Collected off-site & Reused inside the building
NC-v4 SSc4:Rainwater managementposted by Charline SEYTIER on
Hello everyone, Our project is planning to collect all the stormwater in an underground tank for reuse inside the building & for irrigation on-site.
Customer Use of Restrooms
Retail-CI-v4 WEc1:Indoor water use reductionposted by Mélanie Pitre on
Working on a retail project, we have the same case as described by Donny Goris Kolb in his comment : the store's restrooms are intended for employee use, but employees are directed to grant custome
Remediation outside of LEED Project Scope
NC-v4 LTc3:High priority siteposted by Risto Beatty on
Can this credit be achieved if the remediation occurred outside of the LEED project scope? My understanding is that this was not allowed for the Brownfield Redevelopment credit under LEED v3.
Obtaining the credit
CS-2009 SSc2:Development Density and Community Connectivityposted by Paulo Patrício on
Hi. Concerning Sustainable Sites (SS) Credit 2, Developmental Density and Community Connectivity, I have some doubts about the option 1 of this credit.
1-Existing to Remain Parking Space, Reserved for ADA
NC-v4 LTc7:Reduced parking footprintposted by Sara Zoumbaris on
Hello, We have a project that will designate the 1-existing parking space for ADA upon project completion.
Exterior covered spaces
Schools-2009 SSc7.1:Heat Island Effect—Nonroofposted by Aneta Firląg on
We want to use paving block as one of the hardscape surfaces.
Combisteamer water use
Schools-2009 WEc4:Process water use reductionposted by Aneta Firląg on
In our project we have combisteamer, which is boilerless. In installation instruction provided by manufacturer there are 2 different values of water use.
Residential Flush out Requirements
NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancyposted by Rachel Manoguerra on
I've seen two other people ask this question, but can't find that it's been answered. So sorry, if I'm asking an already answered question.