Forum quick links
LEED Campus vs LEED Schools vs LEED NC
posted by Caroline O'Leary on
I'm confused and could use a bit of help. We are in the pre-design phase of a new student center on a higher ed campus that I don't believe has any other LEED certified buildings on it.
Allowable VOC
NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatingsposted by Mike Stopka on
Does anyone know what the allowable VOC level for acoustement Plaster is? I am not sure what to categorize this under. Thanks in advance for any insight
Educational Program
CS-2009 IDc1:Innovation in Designposted by Morteza Kasmaei on
We are working on a LEED-CS project. Our client asked the architects to add a touch-screen kiosk in the building lobby to inform occupants and visitors about the project's green features.
Who develops the plan for corrective action?
NC-2009 IEQc7.2:Thermal Comfort—Verificationposted by Nicole Kimoto on
For a government project if more than 20% of respondants are dissatisfied who would be responsible for developing the plan for corrective action?
Ventilated attic roofs - Baseline Vs Proposed
CS-2009 EAc1:Optimize Energy Performanceposted by Ioannis Rizos on
Dear Community, we have a situation where our proposed design utilizes a double roof (i.e. naturally ventilated attic) as part of the building's passive environmental design.
green roof cover - ivy
CS-2009 SSc7.2:Heat Island Effect—Roofposted by Mario Pinoli on
Hello, I'm working on a project which is considering to use the ivy as green cover.
Vertical addition to a hotel project
NC-2009 MPR2:Must be a complete, permanent building or spaceposted by Adam Targowski on
My client is designing a hotel project which will be built in two phases.
CS - Residential Building
NC-2009 MPR6:Must commit to sharing whole-building energy and water usage dataposted by CRolim Engenharia on
Hi, I work in a project of a multi-family residential building. I have a doubt to fill item 6.
Entry mat in vestibule w/ tile surround
Schools-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by Rebecca Molldrem on
We have a client who will do the entry mat in the main vestibule, but want a band of ceramic tile all the way around it.
Canada-NC 1.0 -- EAc1
posted by Laura Long on
We are going through the third party reviewer portion of the credit and have one final hiccup. A garage type space is heated and conditioned with an energy recovery unit with gas heating.