Forum quick links
MRc4
posted by Pamela Lippe on
Why not use the word disclosure again or transparency rather than reporting in the title?
Treated water for landscaping
EBOM-2009 WEc3:Water efficient landscapingposted by Manasi Kulkarni on
Our project has installed water meters for Irrigation just recently at the start of performance period. The project uses 100% of treated water for Irrigation which is metered.
why the distance between the
NC-2009 SSc1:Site selectionposted by sujata shakya on
why the distance between the previously undeveloped land and a water body is taken 50 feet???? can u more elaborate the reason why the distance is being taken 50 feet......
Infrequent Transient Loads
NC-2009 PIf3:Occupant and Usage Dataposted by Allison Zuchman on
I am working on a high school project. I have a few questions on how to list transient occupant load for spaces with high occupancy but that are used infrequently.
SRI of White Stone Ballast
NC-2009 SSc7.2:Heat island effect - roofposted by Tate Walker on
I am working on a project that has roughly 50% of the roof surface covered in white colored (not white coated) stone ballast and 50% white PVC.
VRP calculation using design occupancy value
CI-2009 IEQp1:Minimum indoor air quality performanceposted by Cassini Kit on
I have a question about the occupancy value of VRP calculation.
Urinal pre-wash and fuzzy control
NC-2009 WEp1:Water use reductionposted by Noriko Nagazumi on
Hi all, How would you set the water use for urinals that: 1. Have a 2 liter pre-wash that may be used or turned off 2.
typical floor v/s whole building simulation
CS-2009 EAp2:Minimum energy performanceposted by shashank jain on
Hi we are doing the eap2 modelling for a 18 floor office building. the floors are all the same. we need to submit the modelling results for precertification.
Upper limit?
EBOM-2009 EAc2.2:Existing building commissioning - implementationposted by American University on
I'm wondering if all identified ECMs have to be included in a longer term capital improvement plan OR if the audit revealed a project with, say, a 12 year pay back period and high implementation co
CONCRETE MIX REPORTING
CI-2009 MRc5:Regional materialsposted by Shane Tohara on
We are using 2 seperate concrete mixes on our CI project. A letter from the manufacture details the raw materials and ratios for each mix. Each type of mix is clearly identified on the invoice.