Topic | Recent |
---|---|
Baseline system selection for LaboratoryNC-2009 EAc1: Optimize Energy Performanceposted by Ramesh Narayanan on Nov 22, 2011, 10:24 am
G3.1.1 exception c stating "For Laboratory spaces with a minimum of 5000 cfm of exhaust, use system type 5 or 7 that reduce the exhaust and makeup air volume to 50% of the design values during... Last reply: Marcus Sheffer, Nov 23, 2011, 9:08 am |
|
Is exterior lighting included?CI-2009 EAc1.1: Optimize energy performance - lighting powerposted by Aaron Levey on Oct 18, 2011, 2:21 pm
We have a restaurant project (LEED for Retail: CI) in which the tenant has a open space. There is a canopy outside used for retail purposes and obviously some exterior lighting. Should we include... Last reply: Aaron Levey, Nov 23, 2011, 7:47 am |
|
CO2 sensor in area designated for F&B (C&S project)CS-2009 IEQc1: Outdoor Air Delivery Monitoringposted by William Wong on Jun 9, 2011, 6:16 am
Our core and shell commecial development involves designation of one floor of the builidng for F&B and design... Last reply: Michael Smithing, Nov 23, 2011, 5:50 am |
|
Office Building Outside USEBOM-2009 EAp2: Minimum Energy Efficiency Performanceposted by Omer Moltay on Apr 26, 2011, 4:30 am
Which path is to be followed for an office building outside the US? Is this considered to be eligible for an Energy Star rating? If not, what are the choices of setting a benchmark? Thanks... Last reply: Eric Johnson, Nov 22, 2011, 4:30 pm |
|
Supplemental CalculatorSchools-2009 IEQc8.1: Daylight and views - daylightposted by Lauren Fakhoury on Oct 12, 2011, 2:11 pm
This supplemental calculator Excel file only seems to create problems every time I used it! Right now, I'm trying to document the prescriptive method for toplighting, but the floor area isn't... Last reply: Eddy Santosa, Nov 22, 2011, 3:59 pm |
|
1% from 15%?CS-2009 EAc2: On-Site Renewable Energyposted by Alicja Bieszyńska on Nov 22, 2011, 11:53 am
I'm working on a Core and Shell project and recently I was given the energy model made for us by a consultant. Although the scope of the project is only Core and Shell, the model covers the whole... Last reply: Marcus Sheffer, Nov 22, 2011, 12:23 pm |
|
Equation 1 InterpretationEBOM-2009 SSc6: Stormwater Quantity Controlposted by Austin Evans on Jun 7, 2011, 3:00 pm
In the Volume Captured equation the variable "I" is said to stand for percent impervious of surface. Is this the same thing as the coefficients or is this different? I thought it could mean 2... Last reply: Gregory Hurst, Nov 22, 2011, 11:33 am |
|
Project Boundary, Site Boundary and BuildingCI-2009 SSc1: Site Selectionposted by Arlee Fisher on Nov 11, 2011, 12:24 pm
We are working on a remodel project encompassing three distinct areas within one portion of a hospital and I am not confident with my understanding of the definitions of Project Boundary vs. Site... Last reply: David Posada, Nov 22, 2011, 11:28 am |
|
Hospital Fixture GroupsNC-2009 WEc3: Water Use Reductionposted by Susan Walter on Apr 29, 2011, 3:05 pm
I'm debating how to set up my fixture groups for a large healthcare project. Initially, it makes sense to split into two groups:... Last reply: Susan Walter, Nov 22, 2011, 8:43 am |
|
Lavatory Faucet default duration change during construcion.NC-2009 WEc3: Water Use Reductionposted by BH . on Nov 18, 2011, 6:53 am
Hi, Because of that from our... Last reply: BH ., Nov 22, 2011, 3:28 am |