Forum quick links
Alternative Walkability Features
Pilot-Credits PC14:Walkable Streetsposted by Emily Loquidis on
Has anyone successfully submitted alternative approaches other than the 9 factors listed within the credit requirements.
ASHRAE Baseline Constructions - with two building types
NC-2009 EAc1:Optimize Energy Performanceposted by Alice chen on
Hi all, Has anybody have experience in working on a large warehouse connected with a small office building? I imported two baseline constructions, one is semiheated for warehouse, the other is no
n/a
posted by robert lohr on
Anyone who can help, I am currently working on a LEED v2009 Retail: Commercial Interiors Volume Project and am wondering how often I need to be citing the work done druring the pre-design phase, d
APPA Audit
EBOM-2009 IEQc3.2:Green Cleaning—Custodial Effectiveness Assessmentposted by Ana Carolina Montecinos Ongini on
What should I do if there's no trash containers in spaces such stairs, mails room? is there any impact in the weighting factor? Thanks
SSc2
NC-2009 SSc2:Development Density and Community Connectivityposted by Erika Duran on
I am working towards the SSc2 credit. Two buildings are currently under construction and floor and site area are unavailable. What should I do? Thanks, Erika
sunset date for projects registered under LEEDv3
posted by Gail Napell on
has anyone heard of a required completion date for projects registered under v3?
SRI values and roof slope
NC-v4 SSc5:Heat island reductionposted by Pam Lynch on
Why does a low-slope roof require a higher initial SRI value over a steep-sloped roof? I'm trying to understand how the SRI requirements are calculated. Thanks
Diesel Exhaust
NC-2009 IEQc3.1:Construction IAQ Management Plan—During Constructionposted by Lawrence Lile on
We have a project where a heavy drill will be drilling micropiles in the basement. It is going to be a diesel powered drill, and it will make a heckuva lot of fumes.
Lighting Levels
Pilot-Credits EQpc78:Design for active occupantsposted by Henry Richardson on
Hello, We received a review comment requesting lighting level diagrams. Are alternatives acceptable, including drawings showing fixture selection or lamp output? Thanks, Henry
Vertical Garden/Green wall
CS-2009 WEc1:Water Efficient Landscapingposted by Carmelito Tatlonghari on
I have a project that is considering installing green wall/vertical garden. We would like to pursue WEc1. Water Efficient Landscaping, Option 2 (No Potable Water Use on Irrigation).