Impervious Area

NC-2009 SSc6.2:Stormwater Design—Quality Control
posted by  Greengrade User  on 

Am I correct in assuming that even though our total impervious area on the site will increase, we can achieve this credit by implementing treatment strategies that capture 90% of the storm water ru

1
Tue May 15, 2012, 2:54 pm

I recently stumbled upon a

NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealants
posted by  Chloe Bendistis  on 

I recently stumbled upon a strange requirement for aerosol adhesives in the IEQ c4.1 credit form v2009 that is NOT listed in the addenda.

0

Addressing playing fields at a school in SSc2 & SSc3

EBOM-2009 SSc2:Building Exterior and Hardscape Management Plan
posted by  Jessica Hawley  on 

Our client is a school with multiple playing fields on the project site.

1
Thu Jun 21, 2012, 9:01 pm

partial renovation / partial expansion EAc1 points

CS-2009 EAc1:Optimize Energy Performance
posted by  Katherine Ann Resurreccion  on 

We've learned that for projects with partial renovation and partial expansion a new points thresholds should be calculated for EAc1.

1
Wed May 9, 2012, 12:17 am

Site Selection - Historic Landmark

NC-2009 SSc1:Site Selection
posted by  David Cloutier  on 

Question: If you performing a Major Renovations with no addition to an existing Historic Building in a Historic Landmark and the project requires minimal new parking spaces and new walkways and the

1
Thu May 31, 2012, 7:59 pm

Window U factor

CS-2009 EAc1:Optimize Energy Performance
posted by  charles bell  on 

Can you use center of glass for EAp2 & c1 or do you need factor for the entire unit?

1
Wed May 9, 2012, 5:10 pm

AGMBC - EBOM Group Project

LEED Guidance for Campuses and Multiple Buildings
posted by  Mark Zoeteman  on 

AGMBC indicates that for O&M projects, all buildings must have space types that are substantially similar.

1
Wed May 9, 2012, 6:52 pm

additional covers at return air grilles

NC-2009 IEQc3.1:Construction IAQ Management Plan—During Construction
posted by  Iris Amdur  on 

In anticipation for a large dust kick-up during finish installation, our project is looking into placing an additional cloth filter on the return air grilles (in addition to the MERV 8 filter).

1
Fri May 18, 2012, 2:04 pm

dishwashers that meet the 1/gal per rack requirement

Schools-2009 WEc4:Process water use reduction
posted by  Suzanne Allerton  on 

Has anyone found dishwashers other than thermador that can meet this requirement?

1
Fri Aug 31, 2012, 1:15 am

Ice Storage and unmet hours

NC-2009 EAc1:Optimize Energy Performance
posted by  James Chueh  on 

We are considering using ice storage in one of the LEED NC project.

0