Forum quick links
Refrigerant Management Plan
EBOM-2009 EAp3:Fundamental Refrigerant Managementposted by Chris Munn on
Does anyone know of a good resource to use as a template for developing a refrigerant management plan for a building?
Shading of Hardscapes
EBOM-2009 SSc7.1:Heat Island Reduction—Nonroofposted by JOHN COOK on
We want to show that we are shading our hardscape but performing the necessary modeling of vegetation shadows at 10am, 12noon and 3pm on the summer solstice is proving difficult.
Ooptimize Energy Performance
CS-2009 EAc1:Optimize Energy Performanceposted by Paula Hernandez on
I am not sure how to estimate a Core & Shell lighting Schedule for an office building, would somebody help me, Thans
Buying & selling RECs
Schools-2009 EAc2:On-Site Renewable Energyposted by Renee Shirey on
If the RECs are sold (solar RECs) is there a requirement that the RECs HAVE to be solar, or can they be any kind of RECs (wind)?
LEED CI - S.S. credit 3.3 - Case 1 - Option 2
CI-2009 SSc3.3:Alternative Transportation—Parking Availabilityposted by Sheela I on
Our project area is less than 75% of the total building area - as we are one of the tenants in 25 floor building. So i guess the project would qualify under Case1 - Option 2.
Dual Flush and HE1.28 gpf mixture
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Paul Telford on
I have a bit of a dilemma on my hands with the WE calculations. By owner request, we specified dual flush toilets throughout the building.
transportation cost
NC-2009 MRc5:Regional Materialsposted by Scott West on
I am working on a project which is being designed for a south pacific island. The majority of the construction materials do not exist on the island with the exception of rock.
FSC-certified products definition and case studies
NC-2009 MRc7:Certified Woodposted by Cassini Kit on
Does FSC organization provide a definition of "product" before? Actually I have two cases for studies.
IEQ 8.1: VLTxWFR - why the upper limit of .180?
CI-2009 IEQc8.1:Daylight and Views—Daylightposted by Andy Plogsted on
i am entering data, and have a small room with wide windows that push the number to .26.
Performance Period for EBOM v2 - using more than the minimum
posted by Tyra Sorensen on
Is there an advantage or disadvantage to using a performance period longer than the minimum required? Using the shortest possible period means the fewest numbers to crunch.