Forum quick links
Exposed slopes
CS-2009 SSp1:Construction Activity Pollution Preventionposted by Gabriela Hernández Castillo on
If the construction site is really "active", that is to say there is earth movement everyday and the slopes are changing every couple of days, do we need to protect them everysingle day? According
Low Flow Kitchen Sink
CI-2009 WEp1:Water Use Reduction—20% Reductionposted by Jay Murray on
We are renovating and entire floor (43,000 office space square feet).
Non-structural wall resurfacing
Schools-2009 MRc1.2:Building Reuse—Maintain Existing Interior Nonstructural Elementsposted by James Ketter on
Our project has existing non-structural plaster walls that will be reused in place.
Removal % in LEED reference guide table.
NC-2009 SSc6.2:Stormwater Design—Quality Controlposted by Emmanuel Pauwels on
If I understand correclty, we can use the table in the reference guide with several BMPs to determine the removal efficiency.
GIB prereq 4 for projects registered during stage 2
posted by Jutta Berns on
we have a LEED ND project in South Africa, which we registered early this year at Stage 2.
Dance studio views
NC-2009 IEQc8.2:Daylight and Views—Viewsposted by Norma Lehman on
this dance studio has windows that provide a "connection between indoor spaces and outdoors" with views to the sky.
Narrative on Data Collection
EBOM-2009 SSc4:Alternative Commuting Transportationposted by Xun Jia on
Can anyone help with the text box asking for a description of the data collection methodology etc.? We are using option 3. The survey went out to everyone and we got 66% participation.
Define "no new parking" - project site is a former parking lot
NC-2009 SSc4.4:Alternative Transportation—Parking Capacityposted by Jill Ziegler on
My project is being built on an old parking lot in a previously developed, campus-style site. The LEED site boundary will be drawn around this building only.
Occupant diversity
CS-2009 IEQp1:Minimum IAQ Performanceposted by Rubén M. R. on
Im working on a C&S building and we have two space types: office and meting rooms. I would like to know if I can use occupant diversity (D) for the outdoor air calculations.
Electric Rates
Schools-2009 EAc1:Optimize Energy Performanceposted by Laura Long on
The electric company for our school project offers a rate structure which includes a lower rate for heat pumps.