Forum quick links
Bird Collision Deterrence
Pilot-Credits SSpc55:Bird collision deterrenceposted by Trinidee Shelton on
Our team is attempting this credit and it appears that the bird threat rating calculation does not include any type of tools to determine the threat of an angled glass which was designed to reflect
FSC Mixed split between MRc7 and MRc4
CI-2009 MRc7:Certified Woodposted by Lloyd Johnson on
We are using products sold as FSC Mixed for our cabinetry in our LEED-CI project.
Reused Windows from the Project Building
CS-2009 MRc3:Materials Reuseposted by Christian Brücher on
Hello, following situation: We have a CS project, where we will have a new construction part and a building renovation.
Separating High Energy Consumer as a "Process Load"
NC-2009 EAp2:Minimum Energy Performanceposted by Todd LaFreniere on
I have a project that is just starting and we have a somewhat unique situation.
time of closing
posted by Tristan Roberts on
Based on the USGBC homepage, I had been telling people last night that the comment period closes today at 9 a.m. EDT. However, I received the following communication thiis morning from USGBC:
Technical Credit reviewer credentials and Review Comment Delays
posted by Erica Downs on
I have 2 questions: 1) What are the credential/experience level requirements for credit reviewers, in particular highly technical credits, and specifically EAp2/EAc1?
Phantom Requirements
posted by Erica Downs on
Will there be any effort, perhaps in the next version, to specify requirements in the Reference Guide, so that team members are not surprised by the "phantom" requirements that appear in the LEED O
School Daylighting - more than one type of VLT
Schools-2009 IEQc8.1:Daylight and Views—Daylightposted by Nanechka Pagan on
I am currently using the prescriptive method supporting LEED calculator. Each classrooms have two types of VLT.
zip car system
NC-2009 SSc4.4:Alternative Transportation—Parking Capacityposted by Gita Nandan on
my client is hosting a zip car car share program into the parking lot of the building. will this count towards meeting the needs to facilitate shared vehicle usage?
E-Waste Line Item Division?
EBOM-2009 MRc8:Solid Waste Management—Durable Goodsposted by Alexis Thompson on
Does LEED require that you break out the e-waste into line items and weigh each line item separately (ie "Computer Monitors... 30 lbs", "Copiers...100lbs")?