Forum quick links
Landscape Factors for Baseline Case
CS-2009 WEc1:Water Efficient Landscapingposted by Oliver Lange on
I would like to know, where I can find a good source for the specific landscape factors (species-, density- and microclimate factor) of plants for the calculations in the baseline case. Is it even
EER requirement and VFD air cooled equipment - Help
CI-2009 EAc1.3:Optimize Energy Performance—HVACposted by Tiombe Parrish on
We have a proposed LEED Silver office building under LEED 2009 for Commercial Interiors.
Materials Which Always Get Review Comments
NC-2009 MRc4:Recycled Contentposted by Hernando Miranda on
It is obvious that the LEED reviewers use a set of predetermined comments for certain material claims made.
new PIf2 forum and resource page
posted by Tristan Roberts on
Hello, LEEDuser now has a dedicate forum page for PIf2, where we hope to add other resources over time. If you have a question on PIf2, please post it there!
SF used for energy model vs. building GSF
NC-2009 EAp2:Minimum Energy Performanceposted by Craig Flandermeyer on
Our building energy model s.f.(table eap2-1) 74,000+/- does not match the gross building s.f. reported in 1.1A 94,000+/-. The difference is approximately 20,000 s.f.
Choosing Baseline HVAC-System in climate zone 1b
NC-2009 EAc1:Optimize Energy Performanceposted by Johannes Hopf on
Hi, 90.1-2007 confuses me a little. Our project (4 story, 9000 m²/90000 ft²) is located in climate zone 1b. The proposed building is heated by an electrical heatpump.
Major Renvation Baseline Building Envelope Selection for Title 2
NC-2009 EAc1:Optimize Energy Performanceposted by Jayme Buresh on
Hi, I know that Appendix G states that if the envelope of a building is renovated, then the existing envelope construction is used for the baseline.
ESC plan implemented after or at the commencement of excavation?
NC-2009 SSp1:Construction Activity Pollution Preventionposted by Valentin Grimaud on
Hi All, we are wondering if the general contractor should implement the ESC at the same time of the leveling and excavation works begin, or if it could done after?
LEED Online form v3
CS-2009 IEQp1:Minimum IAQ Performanceposted by Jens Apel on
Dear all, I'm reviewing our responses to review comments.