Forum quick links
Building with different uses
NC-2009 MPR5:Must comply with minimum occupancy ratesposted by Manuel Broll on
Hi there, i am a little bit confused about the egibility of a building. Within the building there is office (60%), retail (30%) and underground parking (10%).
BMP Non Compliance and / or Removal of BMP Mid-project.
NC-2009 SSp1:Construction Activity Pollution Preventionposted by Richard Palmer on
Please could someone advise as the best way to report the removal of a BMP from the ESCP midway through the project?
Included Furniture
Schools-2009 IEQc4.5:Low-Emitting Materials—Furniture and Furnishingsposted by Johannes Gellrich on
Hello all, I have problems to determine the necessary extent of furniture: The guide says "Classroom furniture including all Student and teacher desks [...]". Do we only have to implement desks, ta
How strictly is the "accessible location" interpreted?
NC-2009 MRp1:Storage and Collection of Recyclablesposted by Christina Nguyen on
We have a 3-story classroom building for a community college.
ASHRAE Forms in LEED Template v4
CI-2009 EAp2:Minimum Energy Performanceposted by Sunayana Jain on
Hi, The LEED template requires to upload interactive forms of ASHRAE. Also, it says it is optional.
Masonry Joint Sealant
NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Erin Holdenried on
Hello. Would Masonry joint sealant fall in under the "Other" category for a VOC limit of 420 g/L?
SSc6.2 form
CS-2009 SSc6.2:Stormwater Design—Quality Controlposted by wendy zhao on
Hello I'm very confused by the calculation methods about the TSS removal efficiency .
Are the units wrong in ”Indoor Air Quality Assessment” (EQc4)?
posted by Maria Porter on
Option 1 is about flush-out.
Stormwater tank
CS-2009 WEc1:Water Efficient Landscapingposted by BH . on
I have a question regarding the retention tank for the irrigation system.
Achieving Green Power in the UK
CS-2009 EAc6:Green Powerposted by Carine Guenand on
Has anyone achieved this credit in the Uk? And do the REC/contract to be in place at the time of handover to the client? The building will not be occupied straight away.