Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Washout Waste

NC-2009 MRc2:Construction Waste Management
posted by  Abena Darden  on 

I've seen previous discussions as to equipment clean-up water waste not being applicable to this credit, but in our project, water and aggregate is generated by the installation of materials.

1
Tue Jan 8, 2013, 3:59 pm

Mechanical Plans still under design

NC-2009 PIf4:Schedule and Overview Documents
posted by  Gaston Viau  on 

We haven't finished yet the design of the mechanical system, so the mechanical plans that we have are just a current aproximation. Is it mandatory to upload the mechanical drawings during the desi

1
Mon Jan 14, 2013, 6:14 pm

Exemption in Retail Rating System

NC-2009 PIf3:Occupant and Usage Data
posted by  Hatice G.  on 

I am looking in which rationg system my project can be classified. It has 88% Retail with storages, 7 % offices and 5% nursery. Can we use Retail and the office and nursery falls into an exemption

1
Mon Jan 7, 2013, 2:27 pm

Document review

NC-2009 EAc3:Enhanced Commissioning
posted by  Adam Rustige  on 

Is reviewing I&O manuals and as-built drawings a requirement for enhanced commissioning? Thanks

1
Mon Jan 7, 2013, 3:10 pm

Sunset Date & Multiple Buildings

LEED Guidance for Campuses and Multiple Buildings
posted by  Cassandra Kail  on 

I'm working on a project that has a Master Site and 2 buildings, Bldg A and Bldg B. Bldg A is scheduled to be finished and occupied 2 years before the Master Site and Bldg B are finished.

1
Wed Jan 23, 2013, 11:46 pm

Design Submittal

NC-2009 IEQc8.1:Daylight and Views—Daylight
posted by  Gaston Viau  on 

This credit cannot be submitted on the deign phase if we choose option 3 (measurement) right? Thanks in advance for your time.

1
Tue Jan 8, 2013, 12:25 am

Combinable Paths to points

NC-2009 IDc1:Innovation in Design
posted by  Gaston Viau  on 

Is it possible to combine the paths? In example: Is it possible to get 3 points for 3 achieved exemplary performances + 1 point for Educational Program + 1 point for an achieved Pilot Credit = 5 P

1
Tue Jan 8, 2013, 12:23 am

Collection of hazardous waste.

ND-v2009 GIBc16:Solid waste management infrastructure
posted by  Martine Desbois  on 

Hi Eliot, the jurisdiction in which the project is located does not collect hazardous waste from the site but provides information on where the hazardous wastes can be deposited in the area.

1
Tue Jan 8, 2013, 6:22 pm

IEQ p1 options

EBOM-2009 IEQp1:Minimum IAQ Performance
posted by  Ramon Gomez  on 

Hi, we are filling the form for the IEQp1 and we have a doubt on what to choose between mechanically ventilated or mechanically conditioned, since we consider our areas mech.

1
Wed Jan 9, 2013, 5:46 pm

outdoor delivery rates in a naturally ventilated space

CI-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancy
posted by  Vera Voropaeva  on 

After receiving the project's review we are asked to provide outdoor delivery rates.

1
Thu Mar 21, 2013, 7:39 pm