Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

EQ p1 -Minimum IAQ Performance (Natural Ventilation)

NC-2009 IEQp1:Minimum IAQ Performance
posted by  Harsharan Kaur  on 

Hello, We are working on a Project, in which most of the rooms are complying with the ASHRAE 62.1-2007 Natural Ventilation requirements, stated under the IEQ Prerequisite 1 – Minimum Indoor Air Qu

1
Mon Jun 30, 2014, 3:29 pm

Case study for education program

NC-2009 IDc1:Innovation in Design
posted by  Crista Shopis  on 

Are there known elements/requirements to include in a "case study" as one of the strategies towards the Green Education ID credit? Is there an outline somewhere that can be followed?

1
Tue Jun 10, 2014, 5:10 pm

CO2 Sensors in Firehouse

NC-2009 IEQc1:Outdoor Air Delivery Monitoring
posted by  David Hahn  on 

In the service bay area (Non-densely occupied space garage) we have a Vehicle Exhaust Removal system AIRVAC911 to maintain air quality and radiant slab heating to condition the space during the win

1
Tue Jun 10, 2014, 5:36 pm

Commingled Collection

Schools-2009 MRp1:Storage and Collection of Recyclables
posted by  Adam Musante  on 

I'm working on a high school project in and confirmed the school district has commingled recycling,with bins in every classroom and major shared spaces & corridors, but might not actually have

1
Thu May 21, 2015, 9:14 pm

Prefered Parking Requirement

Healthcare-v2009 SSc4.4:Alternative transportation - parking capacity
posted by  Todd Bundren  on 

Question: Can my preferred parking for Low emitting parking spaces (SSc4.3) count towards the required car / vanpools in this credit (SSc4.4)? Thanks, Todd B.

0

Landscape Architect Statement template

ND-v2009 NPDc14:Tree-lined and shaded streets
posted by  Colin Inderwish  on 

I am looking for a letter template that checks all of the approprate boxes for the required registered Landscape Archtitect statement declaring: "the details and tree species are appropriate based

1
Tue Jun 10, 2014, 9:12 pm

certification of a building inside of the leed campus

LEED Guidance for Campuses and Multiple Buildings
posted by  manuel de jesus gonzalez duron  on 

can one of the two buildings on a leed campus have the leed certification before the other one?

1
Tue Jun 10, 2014, 9:00 pm

Question on commercial areas in a NC project

NC-2009 MPR2:Must be a complete, permanent building or space
posted by  LEED Pro Consultant  on 

We are working with a project that will be a Bus Station, and it includes a building for the operation (waiting hall, offices, tickets) and a building for the drivers´ resting rooms, both joined by

1
Wed Jul 16, 2014, 8:28 pm

tenants guidelines

General forums
posted by  manuel de jesus gonzalez duron  on 

i have one doubt now the leed v4 is going to be official should a change my tenants guidelines strategy of comercial interior for the leed v4 instead of leed v3 ?

0

Fundamental Refrigerant Management: Leed v4- Campus Credit

EBOM-v4 EAp4:Fundamental refrigerant management
posted by  Patricia Andrasik  on 

We are attempting to get the Fundamental Refrigerant Management credit as a campus credit. We are going to peruse the economic feasibility option with leakage tracking.

1
Wed Jun 11, 2014, 4:54 pm