Forum quick links
10 fc or 25 fc ?!!
NC-2009 IEQc8.1:Daylight and Views—Daylightposted by Nelina Loiselle on
Please help...why does your "Credit Language" section read minumum 10 fc, but the LEED 2009 guide and other comments on this thead refference minimum 25 fc?!!
off-site renewable with local utility
EBOM-2009 EAc4:On-Site and Off-Site Renewable Energyposted by Wendy Gibson on
We currently participate in our natural gas utility provider's off-set program and off-set all of our natural gas usage.
Modeling Narrative Upload?
NC-2009 EAp2:Minimum Energy Performanceposted by Dave H on
I am documenting an energy model for LEED 2009 EAp2/EAc1 and I would like to include a document that describes the modeling techniques used for each modeled system.
Plastic Laminates
CI-2009 IEQc4.4:Low-Emitting Materials—Composite Wood and Agrifiber Productsposted by Sheela I on
Do we have to list Plastic laminate products (like Wilsonart) for this credit?
Rated Power
CI-2009 EAc1.4:Optimize Energy Performance—Equipment and Appliancesposted by Sheela I on
How can i calculate rated power for appliances & laptops? Can i convert the Voltz into Watts and would that be the Rated power of the equipment?
time green cleaning needs to be in place
EBOM-2009 IEQp3:Green Cleaning Policyposted by Gita Nandan on
I am wondering if we are applying this credit as an innovation credit for a NC project, if it needs to be in place before the tenants have moved in, or is there a window of time within which it is
IAQ Flush Out
NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancyposted by J Morrison on
I would like to know what documentation is acceptable to USGS on the flush out process? Is there documentation from the BAS system required?
Help with Submittal Documentation
Pilot-Credits PC4:Innovative Ventilationposted by Erik Ruoff on
Hi LEED Users – I am working on a project that is pursuing an ID credit under Pilot credit 2. We have registered and been accepted for the pilot credit & submitted the feedback survey.
Exemptions
CI-2009 EAc1.1:Optimize Energy Performance—Lighting Powerposted by Andreas Gyr on
I am working on an international project that has novelty lighting and lighting that displays cafe food. Are either of these exempt from EAc1.1?
Criteria of choosing CxA
NC-2009 EAp1:Fundamental Commissioning of Building Energy Systemsposted by Patana Rattananavathong on
There are about 3 CxA sent me their proposals. This is my first project and I wonder that are their any criteria for choosing CxA.