Integral color and LEED concrete tracking form
NC-2009 MRc4:Recycled Contentposted by Wendelyn Bone on
I have documentation from the project's concrete supplier that includes integral color together with cementitious materials.
On Site Solar Power
EBOM-2009 EAc1:Optimize Energy Performanceposted by Julia Weatherby on
Energy Star Portfolio Manager requires that power produced and used on site be included when submitting for an Energy Star rating.
paints for steel door
NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatingsposted by Adi Negara, LEED AP BD+C on
where do these kind of paints fall under the Product Type of Table 1. IEQc4.2 Applicable VOC Limits ?
Late implementation no.2
NC-2009 SSp1:Construction Activity Pollution Preventionposted by Anna Korinkova on
Hello all, I have another question regarding late implementation of the EPA’s requirements. Our project is a shopping mall in Prague, Czech Republic.
Underground parking ramp
NC-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Roomsposted by Anna Korinkova on
Is it possible to use a ramp leading to an underground parking as an entrance for bicycles as well?
Rainwater Harvesting
NC-2009 SSc6.2:Stormwater Design—Quality Controlposted by Udana Ratnayake on
Our project is harvesting and reusing rainwater for flushing. rainwater that falls on the roof is collected in a 10cubic meter sump.
Completing Enhanced Cx Templates for Federal Projects
NC-2009 EAc3:Enhanced Commissioningposted by Hsin-Yi Hsieh on
Many federal projects are design/build (DB) where the DB firm hires the Commissioning Authority (CxA).
Clarification needed on "New" vs "Old"
CI-2009 EAc1.4:Optimize Energy Performance—Equipment and Appliancesposted by Monika Mickute on
Hi, We moved into a new building (CAD production, Document management, and large scale plotting business), which we are certifying under LEED CI.
Audit reccommendation to turn off zone
EBOM-2009 WEc3:Water Efficient Landscapingposted by SIG - Sustainability Main Account on
We performed a full audit of the irrigation system and some of the findings were to turn off zones that are watering established plants or mulch areas.
Site Boundary
posted by Cynthia Estrada on
Phoebe, The buildings must be physically distinct, and have unique addresses or names among other issues according to the Minimum Program Requirements Supplemental Guidance.