Forum quick links
VRP calculation using design occupancy value
CI-2009 IEQp1:Minimum IAQ Performanceposted by Cassini Kit on
I have a question about the occupancy value of VRP calculation.
Urinal pre-wash and fuzzy control
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Noriko Nagazumi on
Hi all, How would you set the water use for urinals that: 1. Have a 2 liter pre-wash that may be used or turned off 2.
typical floor v/s whole building simulation
CS-2009 EAp2:Minimum Energy Performanceposted by shashank jain on
Hi we are doing the eap2 modelling for a 18 floor office building. the floors are all the same. we need to submit the modelling results for precertification.
Upper limit?
EBOM-2009 EAc2.2:Existing Building Commissioning—Implementationposted by American University on
I'm wondering if all identified ECMs have to be included in a longer term capital improvement plan OR if the audit revealed a project with, say, a 12 year pay back period and high implementation co
CONCRETE MIX REPORTING
CI-2009 MRc5:Regional Materialsposted by Shane Tohara on
We are using 2 seperate concrete mixes on our CI project. A letter from the manufacture details the raw materials and ratios for each mix. Each type of mix is clearly identified on the invoice.
Pilot House - Credit 67 Approach
Pilot-Credits EApc67:Energy Jumpstartposted by Ryan Pitera on
We are using this credit for our certification process after not meeting the minimum Energy Star requirements and it seems to be working out great.
SSc4.2 in Multiple Buildings
CS-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Roomsposted by Robert Phinney on
At a new corporate campus, we are trying to apply the credit for C&S via the multiple buildings options.
Bicycle racks and chaging rooms underground
CS-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Roomsposted by Michael E. Edmonds-Bauer on
Our project is providing the bicycle racks and the showers separately in thre differente levels. A set of 6 bicycle racks are on the underground level 1 A set of 28 bicycle racks and 4 showers are
Multiple Buildings: Distance from Showers to Building Entrance
NC-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Roomsposted by Michelle DiPenti on
We are using the Application Guide for Multiple Buildings (AGMB) to certify 4 buildings (Bldgs 1, 2, 3, & 4) as a Group.
EXTRACTION DUCTS AND FANS
CS-2009 IEQc3:Construction IAQ Management Plan—During Constructionposted by Michael E. Edmonds-Bauer on
This might sound obvious, but we wanted to double check. Regarding underground parking encloused parking (no natural ventilation at all), there always will be fans to "push" the air towards the ex