Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Red Alert on Equipment Metric Review Trend

EBOM-2009 SSc2:Building exterior and hardscape management plan
posted by  Jenny Carney  on 

All, we've seen a trend from the review side that we want to share so that folks can be prepared.

1
Sat Apr 28, 2012, 11:06 pm

Medical Equipment: Pilot Credit, LEED Point, Incentive Programs?

Pilot-Credits EApc3:Medical and process equipment efficiency
posted by  Catherine Pana  on 

I work for GE Healthcare and we recently introduced a new CT (Cat-Scan) Scanner to the market that is 60% more electrically efficient.

1
Fri Jan 13, 2012, 6:03 pm

Gender Ratio Impact on WE p1 and c3 Water Calculations

NC-2009 WEp1:Water use reduction
posted by  J Douglas Dietrich  on 

We understand from experimenting with the forms that the results are influenced by the male to female ratio. Are all projects required to use a 50:50 ratio?

1
Thu Jan 12, 2012, 9:00 pm

Pilot Credit #45

Pilot-Credits SSpc45:Site assessment
posted by  Jill DeMarotta  on 

I think this is a good credit.

0

Synthetic turf roofs?

NC-2009 SSc7.2:Heat island effect - roof
posted by  Nelina Loiselle  on 

Would a "green" roof done with synthetic turf apply to this credit under the green roofing option?

1
Tue Jan 24, 2012, 8:41 pm

Determining Baseline System Type

CI-2009 EAc1.3:Optimize energy performance - HVAC
posted by  Rebekah Burke  on 

I am trying to correctly determine the baseline system for my LEED energy model. I have a 7-story hotel building so it will either be System 1- PTAC or System 2 –PTHP based on ASHRAE 90.1-2007.

1
Fri Jan 13, 2012, 5:38 pm

Performance period - general info

Performance Period
posted by  Andy Plogsted  on 

I have not been able to find out much info on perf periods, so I have a few questions.

1
Fri Feb 17, 2012, 5:17 pm

NC Major Renovation with minimal site disturbance

NC-2009 SSp1:Construction activity pollution prevention
posted by  Monika Mickute  on 

Dear LEEDUsers, We are working towards certifying our own office building (an existing 50 year old, single story structure of ~7,000 sf on a 0.64 ac lot).

1
Mon Jan 16, 2012, 4:56 pm

WC average flow rate for residential use

NC-2009 WEp1:Water use reduction
posted by  Udana Ratnayake  on 

we are working on a hotel project where the guest rooms are provided with dual flush (4.5L/3L) WCs. no urinals are provided.

1
Wed Jan 25, 2012, 5:00 pm

Home Automation in Multifamily High Rise Residential Project

NC-2009 EAc1:Optimize energy performance
posted by  Omer Moltay  on 

Dear All, Would it be possible to claim EAc1 credits for local automation in dwelling units to achieve the following: (1) Automatic shut down of lighting and HVAC units when there is no occupancy

1
Mon Jan 16, 2012, 3:05 pm