Drywall scrap

CS-2009 MRc2:Construction Waste Management
posted by  Tobie Nepo  on 

Our contractor proposes to take scrap drywall (new construction) to a landfill where it will be used as "alternate daily cover".

3
Default Avatar
Greenway Recycling, LLC
LEEDuser Basic Member
6 thumbs up
Sat Mar 19, 2011, 8:31 pm

ASHRAE 62 vs. LEED Online

posted by  Jim Newman  on 
3
Fri Mar 18, 2011, 4:59 am

Project boundary within an existing building

CI-2009 SSc2:Development Density and Community Connectivity
posted by  R Jones  on 

Hi - when doing the calculations for option 1 - should i include the sf of the project (ie tenant space) or the whole building - then divide it by the area.

2
Integrated Design & LEED Specialist
SERA Architects
LEEDuser Expert
1361 thumbs up
Thu Mar 17, 2011, 6:04 pm

Water Use Reduction

posted by  Rick Blackshere  on 
5
Wed Mar 16, 2011, 9:01 pm

Food Service Hand Wash Sinks

posted by  Erica Downs  on 
2
Products and materials specialist
BuildingGreen
LEEDuser Expert
21 thumbs up
Wed Mar 16, 2011, 7:35 pm

Wood as thermal barrier

NC-2009 EAc1:Optimize Energy Performance
posted by  javier bolanos zeledon  on 

Is it valid to use 1" wood as thermal barrier for the construction of roof insulation.

5
Wed Mar 16, 2011, 7:24 pm

Showers

posted by  sara theodore  on 
4
Default Avatar
LEED Consultant
The Green Engineer
LEEDuser Basic Member
188 thumbs up
Wed Mar 16, 2011, 7:24 pm

Major renovation

NC-2009 EAc1:Optimize Energy Performance
posted by  javier bolanos zeledon  on 

This is a major renovation of an old office building. The new building will use structural walls and metal roof of previos building.

3
Wed Mar 16, 2011, 7:13 pm

IT ROOM LOADS

NC-2009 EAc1:Optimize Energy Performance
posted by  javier bolanos zeledon  on 

In an IT room there are envelope loads and equipment loads due to HVAC needed to cool the space. Also the electric load due to the IT equipment running.

4
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Wed Mar 16, 2011, 6:35 pm