Forum quick links
Aren't Corrections only supposed to be published in Apr and Oct?
posted by RETIRED on
Tristan - Your comment above "and I've been told to expect none in the second quarter either)" seems unusual because my understanding from Theresa Backhus was that Addenda (now Corrections) were on
Landscaping in phases
NC-2009 WEc1:Water Efficient Landscapingposted by Alexia Anastassiadis on
Hello everyone, I'm working on a project that contains a very large green area. The project will not have irrigation of any kind, since the project is situated in a temperate-humid region.
weighted sound reduction index VS STC
Pilot-Credits EQpc24:Acousticsposted by Ian McCall on
Hi, This credit require to evaluate the sound isolation performance of constructions using STC rating which is very common in US. Our project is in Europe where STC rating is not use.
Light Power Density Calculated Method
Retail-CI-v2009 EAp2:Minimum energy performanceposted by John Kitsalis on
I understand that their are two methods to calculating the LPD. In the process of selecting which method to choose, are there any requirements that the project must meet?
Water Usage vs FTE Classification
Schools-2009 WEc3:Water Use Reductionposted by Sadie Martin on
Hi, We are working on sizing a rainwater tank for a new building on an urban high school campus.
FSC Wood type and certification
CS-2009 MRc6:Certified Woodposted by Lilian Seow on
I got a declaration letter from the manufacturer of the glulam. The letter states the wood was purchased from a sawmill and it's is FSC Mixed Credit. 1.
Design stage submittal credits
posted by Sylvain laporte on
I m currently studying for LEED AP BD+C exam . I failed to find and updated list of credit eligible for design stage submittal. I guess there is something obvious that i missed.
Other feature that meets the intend of the credit?
Pilot-Credits EQpc78:Design for active occupantsposted by Marina Mihalcea on
Hi! What if we have an element that meets the intend of the credit but is not included in the list of 11 features from which to choose?
Option 1 - Combination of approaches allowed?
CI-2009 MRc5:Regional Materialsposted by R Jones on
Is it possible to use a combination of the 500 mile radius and the alternative compliance path addressing the mode of transport when documenting this credit ?
waste management by bedroom vs sf
Homes-v4 MRc3:Construction waste managementposted by Elizabeth Eason on
LEED v4 for homes Table 1:Baseline Waste list waste by both bedrooms and conditioned space but there is no guidance as to when one should use conditioned sf vs bedrooms.