Forum quick links
Recycling Building Products
CS-v4 MRc5:Construction and demolition waste managementposted by Ciaran McCabe on
PC44 - where is the "Pilot Credit Feedback Survey"?
Pilot-Credits EQpc44:Ergonomics approach for computer usersposted by Leticia SooHoo on
Our project is pursuing LEED v4 EQ44 -
Link to Zip Code Tool
Pilot-Credits IPpc98:Assessment and Planning for Resilienceposted by Jill Kurtz on
The Hazard Assessment prerequisite calls for “review [of] site-specific references where available to identify hazard risk modifiers of a particular location (e.g.
Innovation and Pilot credit clarification on Cleaning Policy
Retail-CI-v4 INc1:Innovationposted by Toshif Ruikar on
Hi,
EA Credit: GHG Emissions Reduction
posted by James Lee on
This credit provides 3 options to achieve a total of 12 points for GHG emissions reduction:
1. Option 1 (reduction of Scope 1 emissions): 1-6 points.
Option 1: General Contractor, (and? or?) Subcontractor and Trades
Pilot-Credits IPpc90:Social equity within the operations and maintenance staffposted by Vanessa Hostick on
In reviewing the language for Option 1 item 2, it is not clear if this language applies to all trades under the construction contract.
Comments - per IFMA
posted by Josh McIlwain on
Comment 1: Location and Transportation (LT) – Public Comment Draft, Page 10 Granted a maximum of 10 points, this credit category is overweight, given that an existing building has no control over i
Previous Buildings Demolition activities
NC-v4.1 MRc5:Construction and Demolition Waste Managementposted by Carla Joan Carrasquillo on
I'm working with a project that comprehends various buildings (~20), from which only 10 will be certified.
Innovative Strategies
Pilot-Credits SSpc154:Heat Island Mitigation with Cool Wallsposted by Dulce Solis on
Has anyone utilized innovative design approaches or unique cool wall materials for Heat Island Mitigation (SSpc154)?
Optimizing Cool Wall Design
Pilot-Credits SSpc154:Heat Island Mitigation with Cool Wallsposted by Dulce Solis on
What strategies or design considerations have you found effective in maximizing the heat island mitigation benefits of cool walls while minimizing potential negative impacts such as glare, maintena