Tenant Lease and Sales Agreement x Design Review

General forums
posted by  WAGNER OLIVEIRA SILVA  on 

Normally we send documents to Design Review before the project be sold in part or entirely by the Owner.

1
Fri Apr 22, 2011, 11:01 pm

5 star Energy Star House

EBOM-2009 EAp2:Minimum Energy Efficiency Performance
posted by  John Kinch  on 

Hello again, Our facility is already a 5 star energy rated building. Is there any way to cut corners on this paperwork? Thanks!

1
Tue Mar 29, 2011, 4:52 am

Innovative water efficiency

EBOM-2009 IOc1:Innovation in Operations
posted by  Melissa Merryweather  on 

A project considering LEED EBOM is looking to add a new rainwater catchment system because it will be lower-cost then replacing old sanitary ware.

1
Thu Mar 24, 2011, 11:58 am

Multi-parameter alternative product analysis

Pilot-Credits PC2:PBT Source Reduction: Dioxins and Halogenated Organic Compounds
posted by  Jeff Gearhart  on 

We are pursuing this credit for a CI project. Interested in any further guidance on "multi-parameter alternative product analysis".

1
Fri Apr 1, 2011, 7:18 pm

Guadua

NC-2009 MRc6:Rapidly Renewable Materials
posted by  Carlos Alberto Hoyos Soto  on 

I want to know if anyone has use guadua, and if it is considered as rapidly renewable material, thanks.

1
Thu Mar 24, 2011, 3:30 pm

DES Commissioning

NC-2009 EAc3:Enhanced Commissioning
posted by  Margaret Montgomery  on 

We're looking at a project where we do meet all the conditions for enhanced commissioning that would indicate we need to commission the district energy plant (third party, local CHP plant), but we'

1
Tue Apr 26, 2011, 12:37 pm

Maximum Points Available

EBOM-2009 EAc1:Optimize Energy Performance
posted by  David Hubka  on 

The LEED O&M reference guide states that two points are available under EA Credit #1 for projects that follow Case 2 Option 2A however the LEED online template does not award credits under this

1
Fri Mar 25, 2011, 6:14 pm

LEED Online Language

CI-2009 IEQc6.2:Controllability of Systems—Thermal Comfort
posted by  Simon Sue  on 

The credit intent and application is very clear as stated above: "Private offices and open space offices need multiple controls for 50% of occupants.

1
Tue Mar 29, 2011, 5:29 pm
1
Fri Apr 1, 2011, 10:13 pm

Applying both Case 1 and Case 2 to our site?

NC-2009 SSc5.1:Site Development—Protect or Restore Habitat
posted by  Shannon Terrell  on 

We have a site that is partially a greenfield and partially previously developed (remediated brownfield).

1
Fri Mar 25, 2011, 9:44 pm