Forum quick links
Ask about light and views Index
NC-2009 IEQc8.1:Daylight and Views—Daylightposted by Jose Alfonso Vergara Vasquez on
Hi , I wonder what happens when you have more windows than is required and the index exceeds the recommended? Thanks.
Construction Waste management
NC-2009 MRc2:Construction Waste Managementposted by Piotr Podhajny on
What if you have two buildings each persuing LEED certification both build by the same contractor but two owners. How do you seperate the waste amount from both building?
Alternative Walkability Features
Pilot-Credits PC14:Walkable Streetsposted by Emily Loquidis on
Has anyone successfully submitted alternative approaches other than the 9 factors listed within the credit requirements.
ASHRAE Baseline Constructions - with two building types
NC-2009 EAc1:Optimize Energy Performanceposted by Alice chen on
Hi all, Has anybody have experience in working on a large warehouse connected with a small office building? I imported two baseline constructions, one is semiheated for warehouse, the other is no
n/a
posted by robert lohr on
Anyone who can help, I am currently working on a LEED v2009 Retail: Commercial Interiors Volume Project and am wondering how often I need to be citing the work done druring the pre-design phase, d
APPA Audit
EBOM-2009 IEQc3.2:Green Cleaning—Custodial Effectiveness Assessmentposted by Ana Carolina Montecinos Ongini on
What should I do if there's no trash containers in spaces such stairs, mails room? is there any impact in the weighting factor? Thanks
SSc2
NC-2009 SSc2:Development Density and Community Connectivityposted by Erika Duran on
I am working towards the SSc2 credit. Two buildings are currently under construction and floor and site area are unavailable. What should I do? Thanks, Erika
sunset date for projects registered under LEEDv3
posted by Gail Napell on
has anyone heard of a required completion date for projects registered under v3?
SRI values and roof slope
NC-v4 SSc5:Heat island reductionposted by Pam Lynch on
Why does a low-slope roof require a higher initial SRI value over a steep-sloped roof? I'm trying to understand how the SRI requirements are calculated. Thanks
Diesel Exhaust
NC-2009 IEQc3.1:Construction IAQ Management Plan—During Constructionposted by Lawrence Lile on
We have a project where a heavy drill will be drilling micropiles in the basement. It is going to be a diesel powered drill, and it will make a heckuva lot of fumes.