Forum quick links
Bicycle Facilities - Shower requirement
NC-v4 LTc6:Bicycle facilitiesposted by akshaya bhaskar on
We are currently working on a park Shelter in a public park In the united states. The shelter is open for bookings to the public for fixed periods at a time.
Fundamental Commissioning of On-Site Solar Array
NC-2009 EAp1:Fundamental Commissioning of Building Energy Systemsposted by Rachel Williams on
I am working on a project that, through a series of contract issues during construction, does not have commissioning documents for the PV array.
LEED v4 sunset date confirmation...
posted by Rick Alfandre on
I don't see explicit clarity on the question of LEED v4 vs v4.1. Can anyone confirm that LEED v4 is still legitimate to register a project under?
Designing for Disassembly/Deconstruction: DeCon Hackathon 2 May 25
posted by Barbra BatShalom on
Greetings Gurus!
Please sign up and spread the word (even if you can't attend, sign up to get follow up info!)
Designing for Disassembly/Deconstruction: DeCon Hackathon 2 May 25
posted by Barbra BatShalom on
Greetings Gurus!
Please sign up and spread the word (even if you can't attend, sign up and get follow up info!)
Sound Rating Method - can these vary per space types?
NC-v4 EQc9:Acoustic performanceposted by Iris Meeker on
For HVAC Background Noise, do all spaces have to use the same Sound Rating Method (NC/RC, dBA,
dBC, RC(N)), or can these vary by individual space or by space type?
Unconditioned area - Baseline
CS-v4 EAc2:Optimize energy performanceposted by Sarah Leenknegt on
Hi
My proposed building has a number of unconditioned spaces (per definition according to Appendix G):
Prerequisite questions for Minimum Energy Performance v4.1
NC-v4.1 EAp2:Minimum Energy Performanceposted by Greenlab on
For the prerequisite, can we obtain it, if we only achieve improvements on one of our indicators (Cost or GHG emissions)? e.g. -9.4% for Cost and +14.4% for GHG Emissions
Option 3 - Product Manufacturer Supply Chain Optimization
CI-v4 MRc5:Building product disclosure and optimization - material ingredientsposted by Edgar Arevalo on
Has anyone been able to tackle the third option for this credit, which is not shown in the BPDO calculator?