Forum quick links
third-party verification of landfill diversion docs (re-post)
NC-2009 MRc2:Construction waste managementposted by Jeff Jones on
I am considering submitting a Pilot LEED Credit for verifying (or certifying) the actual recycling of building waste materials, whether it is from construction or an EBOM operation.
Time Committment on Option 1 - Provide Spaces
NC-2009 SSc4.3:Alternative transportation - low-emitting and fuel-efficient vehiclesposted by Cynthia Estrada on
Is anyone aware of a time committment on providing LE/FEV Spaces for this credit? The Owner of our project posed the question since the Discounted Parking rate has a minimum of 2 years.
What if 2/3 of the project is Major Refurbishment?
posted by Maya Karkour on
Hello, I was wondering if I could get your opinion on which LEED Scheme I should use. Our client wants to entirely refurbish a school block that is 100 years old.
Daylighting
CI-2009 IEQc6.1:Controllability of systems - lightingposted by Sam Keehn on
Daylighting is mentioned as a method for meeting the credit requirement of a lighting control. Our project is an open plan with a small number of work stations all within 20 feet of the window.
A troubled history
posted by Raphael Sperry on
In terms of negatives users should be aware of, I find the origins of Green globes quite troubling.
Campus Reasonable Site Boundary
posted by Dana Murdoch on
I am working on the documentation for a 2009 LEED-NC renovation of a single campus residence hall. I would love some clarification on a few items. 1.
Starting Performance Periods
posted by Prudence Ferreira on
We registered our project a few months ago but have just recently paid the fee due to a delay.
Sharing Waste Bins
CS-2009 MRc2:Construction waste managementposted by Elizabeth Durney on
Hello We have a project that is attempting LEED-CS certification. A tenant in the same building is simultaneously attempting LEED-IDC certification.
Building Over Hang
CI-2009 EAp2:Minimum energy performanceposted by Simon Sue on
We working on a commercial bank and calculating the installed LPD in the project space. The commercial bank has a overhang on the 1st floor and is included in our LEED boundary.
imprevements made befor the performance periods
posted by Alicia Villanueva on
I am working with a hotel chain that has been working on energy efficiency fo years now, their figures are super good, even if we implement a plan to improve them we will not get to much as they ha