Forum quick links
Off-site charging station
NC-v4 LTc8:Green vehiclesposted by Kristina Pobre on
Client is developing a ha land. We are applying certification for only a small part of it (about 2%). The LEED-project has its own parking and a % of it is for green vehicles.
Off-site charging station
NC-v4 LTc8:Green vehiclesposted by Kristina Pobre on
My client is developing a big parcel of land. We are applying certification for only a small part of it (about 2%). The LEED-project has its own parking and a % of it is for green vehicles.
EV Charging Stations
NC-v4 LTc8:Green vehiclesposted by Steven Wychorski on
There is a conflict with the Online form and the Reference guide/LEED Online. Both LEED Online and Reference guide clearly state that EV Charging stations must be 2% of total Parking spaces.
Reduced truck idling
NC-v4 LTc8:Green vehiclesposted by Julia Otero on
In a warehouse to pursue option 2, which characteristics must have external connectors in terms of power and position acording to the loading docks? Thanks!
Green Vehicle permitting and parking enforcement
NC-v4 LTc8:Green vehiclesposted by Kristen Callori on
Page 128 of the v4 Reference Guide shows a picture of preferred parking signage that includes the words "Permit Required".
LEED for Schools - Option 2, Buses and School-Owned Vehicles
NC-v4 LTc8:Green vehiclesposted by Nathan Gauthier on
Has anybody tried this credit? Our client is OK with the commitment for buses, but they also need all of their school-owned vehicles to have an ACEEE score of 45.
Combining LEV/FEV and Discounts
NC-v4 LTc8:Green vehiclesposted by Brightworks Sustainability on
Has anyone heard of an alternative method for combining preferred parking for green vehicles and also providing a discount?
LIghts pointing upwards
EBOM-v4 SSc4:Light pollution reductionposted by David Lazaro on
Hello, We have a very singular high-rise Project in the city centre.
LCA calculation
NC-v4 MRc1:Building life-cycle impact reductionposted by Emmanuel Pauwels on
1- When performing a LCA calculation for the envelope and structure, not all materials proposed by the design team have an EPD.
Level of detail (cfm) with Trane Trace for LEED -S & L buildings
NC-2009 EAp2:Minimum Energy Performanceposted by Maria Spastri on
Hi all, For the people who have submitted for LEED (v3) using Trane Trace: To what level of detail do you model the heating and cooling cfm and exhaust cfm on room/zone level for large buildings?