Forum quick links
Exterior Lighting not yet designed
NC-2009 EAp2:Minimum Energy Performanceposted by Maya Karkour on
Dear All, I am modeling a project which still has no exterior lighting design (the owner will decide on this when the building is almost complete). In the preliminary design review, I put the val
CSRs
NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materialsposted by NESLIHAN AKSOY on
These reports are very wide range ...but the credit is dealing with sources of raw material extraction.....?
Non-Smoking Policy
CI-2009 IEQp2:Environmental Tobacco Smoke (ETS) Controlposted by Erika Duran on
Dear All, I have a hotel project that has a non smoking policy for the entire hotel.
Getting Buildings (inside certified Neighborhood)LEED certified
posted by Yousef Zakaria on
Dear Experts I have project outside the US consist of 508 building inside one development (more than 190 acre) where 90% of these buildings will be residential but it will include basic services (b
Mixed-mode ventilation
NC-2009 IEQp1:Minimum IAQ Performanceposted by Lise Dannesboe on
Dear all! How do you show compliance with case 1 for GBCI, mixed-mode ventilation?
LEED V4 Canada, paint Questions
posted by Francois Bellefleur on
Good morning, first time here, with the new LEED v4 in Canada I have a few questions about the paint for new construction. Does the regional distance of 800KM still in place in LEED V4 ? Does the V
HET Retrofit
NC-2009 WEc3:Water Use Reductionposted by Matthew Catterall on
I've noticed that dual-flush flushometer retrofit kits are mentioned as a way to earn this credit on existing commercial toilets (rather than replace the entire toilet); however, there is no mentio
Residents excluded?
EBOM-2009 SSc4:Alternative Commuting Transportationposted by Miranda Lescaze on
A portion of our building is office space and a portion is multi-family senior residences.
WEp1 - PIf3 link - new LEED on line
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Todd Bundren on
My project was upgraded to the new version of LEED online around the beginning of the year so I am getting used to the new set up (so far it is very nice).
Parking Area Clarification
posted by Kristy O'Hagan on
In the latest Update to LEED Interpretation (LI) 10079 & 10080, the 75% maximum limit on area devoted to vehicle storage & circulation has been removed. As of October 1, 2012: So as not to