Forum quick links
FFE and UF
CI-2009 IEQc4.4:Low-Emitting Materials—Composite Wood and Agrifiber Productsposted by Eszter Gulacsy on
I am working on a project where we are trying to get this credit and one sentence on the credit requirements is causing us a bit of trouble.
SS Credit 1, Option 2, Path 5 Heat Island Effect – Roof
CI-2009 SSc1:Site Selectionposted by Augusto Velazquez on
I am working on a CI project. The project’s area is part of a large commercial facility which includes many other tenants.
Materials - Core & Shell
CS-2009 MRc5:Regional Materialsposted by Joaquim Lima on
Good morning! my project is classified as Core & Shell, I wonder if the calculations for credit 5 (Materials and Resources) should consider only the materials used in the common areas of the
WE p1/C3 in Core & Shell
NC-2009 WEc3:Water Use Reductionposted by Anu Sumanth on
If all the plumbing fixtures are to be installed in future by tenant, and if I check Tenant Neutral for WE p1; I will not be able to achieve the prereq. 20%. Is this typical?
Combined Sewer Areas
Pilot-Credits WEpc10:Sustainable wastewater managementposted by Scott Durbin on
In areas with combined sewers, could option 1 be achieved by reducing runoff volume to the sewer?
Tracking compacted trash and loose recyclables
EBOM-2009 MRc7:Solid Waste Management—Ongoing Consumablesposted by Kristen Salinas on
My project is having problems tracking their trash and recyclables by volume. The trash is compacted 4:1 in a trash compactor.
Water filtration
CS-2009 SSp1:Construction Activity Pollution Preventionposted by Gabriela Hernández Castillo on
How much filtration is required when discharging rainwater that contains suspended solids? We have some rainwater acumulation and we would like to know if a simple screening will be enough.
80% adoption for CaGBC users
EBOM-2009 SSc2:Building Exterior and Hardscape Management Planposted by Emma Sanborn on
Note to any CaGBC users: CaGBC doesn't mention a 20% minimum anywhere in SS c2.
we p1
EBOM-2009 WEp1:Minimum Indoor Plumbing Fixture and Fitting Efficiencyposted by Antonio Pellegrino on
This is the first time I am working on a LEED EBO&M project and I had the following question: if the bathrooms on two floors only are being renovated in a 7 story bldg.
University lounge/corridors
NC-2009 IEQc6.1:Controllability of Systems—Lightingposted by ANNE JURAN on
I'm working on a University classroom/office building. There are enlargements in the corridors that are labeled "Lounge".