Forum quick links
Integrative Process Credit
posted by Melissa Wrolstad on
For BD+C: What do they mean by "cascading" in the phrase - "demonstrate how at least one on-site non-potable water supply source was utilized in cascading ways to reduce the burden on municipal sup
Site Assessment Credit
posted by Melissa Wrolstad on
Since this credit would need to happen before schematic design - doesn't it make sense to combine it with the Integrative Process section?
Low-Emitting and Fuel Efficient Vehicles
posted by Melissa Wrolstad on
Doesn't it make sense for this credit to be available to all building types?
Included materials for cost basis?
posted by Nadav Malin on
The Materials Life-cycle disclosure and assesment credit, Option 1 and Option 3, includes a pretty specific list of mateirals that MAY be included:
Move historic & blighted buildings to LT High Priority Site
posted by Mara Baum on
I really like some of the changes that LEED 2012 makes with respect to historic and blighted buildings.
Move historic & blighted buildings to LT High Priority Site
posted by Mara Baum on
I really like some of the changes that LEED 2012 makes with respect to historic and blighted buildings.
Low-Emitting Interior Credit: Positive Improvements
posted by Nicole Munoz on
The revisions in the proposed EQ credit Low-Emitting Interiors will strengthen the requirements, heighten the level of transparency, and increase the value of 3rd party certification.
Not that so
posted by Ricardo Sobral on
I work for an international project and construction company implementing LEED certification. In my company, safe & safety issues are almost a dogma.
Reintroduce two free CIRs
posted by Mara Baum on
Remember when USGBC granted each project two free CIRs?
EQ Credit: Acoustical Performance - Needs cleaning
posted by Joseph F. Bridger on
If someone else has not submitted a comment, I have more than I submitted (one per credit per person and cannot edit!) 1. suggests a noise range must be met.