Forum quick links
Retail - commercial interiors
CI-2009 SSc3.3:Alternative Transportation—Parking Availabilityposted by eileen hughes on
There is existing parking but no DESIGNATED parking will be provided for Tenant employees.
Timing of Installation of Fixtures
CI-2009 WEp1:Water Use Reduction—20% Reductionposted by Dax Ponce de Leon on
Do fixtures need to be installed prior to occupancy? Prior to project completion?
Maintenance Staff Training
EBOM-2009 WEc4:Cooling Tower Water Managementposted by David Hubka on
LEED User offers the following advice for projects that completely outsource their cooling tower management: "Unless cooling tower management is completely outsourced, staff training is required, e
Improper Product Claims
NC-2009 MRc4:Recycled Contentposted by Eric Shamp on
I have sort of a minor ethical crisis: I'm reviewing the website of a not-to-be-named tile manufacturer who is claiming 40% MRc4 recycled content in their product, due to the reintroduction of scra
50% Furniture Used at Another One of Our Offices
CI-2009 MRc3.2:Materials Reuse—Furniture and Furnishingsposted by Reynaldo Castro on
We are moving about half of the existing furniture from our office to another one of our office locations to be used.
Qualification of CxA
NC-2009 EAp1:Fundamental Commissioning of Building Energy Systemsposted by James Chueh on
Quick question, can the contractor of building's BAS (for both the installation and manufacturer of DDC/control components) be designated to be the CxA?
What daylight modeling programs??
CI-2009 IEQc8.1:Daylight and Views—Daylightposted by Susan M. Kaplan on
We are trying to evaluate the best way of meeting this requirement through Option 1 - Simulation according to the latest (May 2011) Addenda changes (min. 10 fc on Sept.
Hotel Passengers
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Catalina A on
Are Hotel Passengers considered transients or residents?
Good or no?
EBOM-2009 WEp1:Minimum Indoor Plumbing Fixture and Fitting Efficiencyposted by Elizabeth Crenshaw Hammitt on
The way I am interpreting this credit, it would seem that is the project was built post 1994, while a baseline can be calculated, there is no chance of not meeting the PR as long as a satisfactory
Cx for Domestic HW to Point of Connection - Sink only
CI-2009 EAp1:Fundamental Commissioning of Building Energy Systemsposted by Harvard University Green Building Services on
We have a project where a sink was added as part of the scope and tied into existing cold and HW supply lines, with no alteration to any other part of the domestic HW system.