NC-2009 SSc5.1:Site development - protect or restore habitatposted by Julien Lafond on
This project with large window areas is installing sun control window films which rejects 72% total solar energy and gives 66% of solar heat reduction.
HVAC Systems Selection for Baseline
CS-2009 EAc1:Optimize energy performanceposted by Mark Stromberg on
My question is regarding the following procedure as outlined in Trace 700 help: "To determine which ASHRAE baseline system to model, refer to ASHRAE Standard 90.1-2007, Table G3.1.1A (below).
Chemical/Hazardous Gas Area Separation
NC-2009 IEQc5:Indoor chemical and pollutant source controlposted by Brian Harris on
We have a project that has a garage which has storage, mechanical and other occupied spaces accessed through doors.
Electric instantaneous water heater
NC-2009 EAp1:Fundamental commissioning of building energy systemsposted by CT G on
Hi, The design team is specifying an electric instantaneous water heater on a project we are working with.
Methyl Hydrate Solvent
NC-2009 IEQc4.2:Low-emitting materials - paints and coatingsposted by Lilian Seow on
This is for cleaning pipes prior actual coating and painting application. I understand that this solvent does emit strong odor and as such application after hours is preferred.
LEED Boundary Question
NC-2009 PIf2:Project Summary Detailsposted by Todd Bundren on
I have an interesting case. A building on my site is being demolished as part of my project scope and will be grassed over.
Who includes taxes in their cost calculations?
NC-2009 MRc7:Certified woodposted by Kevin Flynn on
Just curious - how many of you include taxes in the cost calculation for your materials credits? I typically only include the cost of the wood (or other material) products themselves.
Reclaimed wood
NC-2009 MRc4:Recycled contentposted by Christina Quilter on
Our project is utilizing a significant amount of wood reclaimed from an old cannery in the area.
So few parking spaces and although more carpool parking spaces.
CI-2009 SSc3.3:Alternative transportation - parking availabilityposted by Mathilda Jonsson on
My question is similar to Rebecca Hart's question below. My LEED CI project falls under case 1, option 2.
Hidrogel use
NC-2009 WEc1:Water efficient landscapingposted by LEED Pro Consultant on
We´re working on a landscape project in a hot&dry city and a drought-resistant grass is being proposed.