Kitchen Make-up air unit

NC-2009 EAp2:Minimum Energy Performance
posted by  Anil Bhari  on 

Is Make-up air unit considered as process load? Since kitchen has its own cooling and heating system.

11
Fri May 23, 2014, 4:55 pm

Do school buses contribute to the Option 2 rate

Schools-EBOM-v4 LTc1:Alternative transportation
posted by  R. Ted Krasnesky  on 

Do school buses contribute as a "ride share" option for students that contribute to the Option 2 alternative transportation rate?

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Fri May 23, 2014, 3:54 pm

UNDERLAY underneath carpet tiles

NC-2009 IEQc5:Indoor Chemical and Pollutant Source Control
posted by  jack larson  on 

acceptable entryway systems include permanently installed grates, grills, and slotted systems that allow for cleaning underneath.

3
Energy Program Specialist
PA DMVA
LEEDuser Expert
626 thumbs up
Fri May 23, 2014, 2:57 pm

Certified LEED CI project going for EBOM

EBOM-2009 SSc1:LEED Certified Design and Construction
posted by  Michelle Raigosa  on 

Has anyone with a previously certified LEED CI Silver project (that occupies an entire building with a triple net lease) earn SS Credit 1 under the EBOM rating system (since it was not certified un

3
President
Design Management Services
LEEDuser Premium Member
25 thumbs up
Thu May 22, 2014, 4:15 pm

location of charging stations

NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehicles
posted by  Sahar Abi-Ziki  on 

We are installing 12 charging stations in the project, and we are wondering where is the preferential spot to install them. 4 will be installed outside to accommodate visitors and the rest inside.

3
Thu May 22, 2014, 4:00 pm

SSc7.2 Heat Island Effect, Roof

NC-2009 SSc7.2:Heat Island Effect—Roof
posted by  Francisco Villela  on 

LEED 2009. NC: I am using the LPE option for SSc7.2. Is it normal for the form NOT to indicate points documented at the bottom when completing the form using the LPE option?

6
LEED AP BD+C, O+M, Green Globes Professional
JLL
LEEDuser Basic Member
112 thumbs up
Wed May 21, 2014, 3:31 pm

LEED CS & CI built at the same time.

CI-2009 IDc1:Innovation in Design
posted by  Emmanuel Gee  on 

Hello, We have a project where the CS and one CI tenant is being built at the same time.

2
Director - Green Building Advisory
Colliers International Ltd.
LEEDuser Basic Member
201 thumbs up
Wed May 21, 2014, 3:07 pm

DOOR ADEHSIVE

NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealants
posted by  jack larson  on 

I have a special synthetic resin adhesive developed for flush door construction.

3
Tue May 20, 2014, 9:41 pm

Performing testing under Option 2 - number of samples

NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancy
posted by  Adriana Hansen  on 

For performing testing under Option 2 (IAQ Testing), for a singular space above 25,000 sf served by several similar AHU systems, could it be acceptable using the “1/25,000 SF or each contiguous are

3
Manager
CTE - Centro de Tecnologia de Edificações
LEEDuser Basic Member
80 thumbs up
Tue May 20, 2014, 4:44 pm

small strips of plywood

NC-2009 IEQc4.4:Low-Emitting Materials—Composite Wood and Agrifiber Products
posted by  jack larson  on 

Most regular composite wood contains/ added urea formaldehyde.

2