Forum quick links
GC Responsible for Implementing Option B?
NC-2009 EAc5:Measurement and Verificationposted by Marcia Weekes on
Does anyone have any experience with projects where a GC has been given the responsibility for implementing the M&V credit using Option B?
A material with zero VOC content
NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by dia2000@gmail.com dia2000@gmail.com on
Hello, We are submitting data about certain materials that has "zero" VOC content according to manufacturer's datasheet.
Anti-Rust vs flat primer
NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatingsposted by Michelle Raigosa on
Does anyone have any insight/thoughts/comments/experience about categorizing an anti-rust coating as compared to categorizing the product as a flat coating/primer?
Loading dock and parking to be counted in Gross Floor Area?
NC-2009 PIf2:Project Summary Detailsposted by Deborah Lucking on
Until last week I was pretty sure that all parking whether enclosed by the building, or on the roof of a building should be excluded from the Gross Floor Area number.
No Permanent Irrigation System
EBOM-2009 WEc3:Water Efficient Landscapingposted by Kevin Sullivan on
Hi we are attempting this credit for one of our existing schools project.The project does not have permanent irrigation system.The landscape area is irrigated manually by the facility staff member
Enhanced Cx - Submittal reviews - HVAC&R only?
NC-v4 EAc1:Enhanced commissioningposted by André Harms on
In reference to the V4 LEED Reference Guide for Building Design and Construction, Enhanced Commissioning section: In the Step-by-Step guidance, “Step 4.
ASHREA 0-2005
NC-v4 EAc1:Enhanced commissioningposted by Amrit Kaur on
Any one knows where I can get the referenced 0-2005 standard? officially its no longer available from ASHREA and superseded by 0-2013. Any idea how different they may be?
Energy Star eligibility for very large Display Monitors
CI-2009 EAc1.4:Optimize Energy Performance—Equipment and Appliancesposted by Harry Flamm on
Nowhere on the Energy Star site can I find out if 75" wide and larger Professional Display Monitors (such as Samsung or NEC for conference rooms) are eligible or not for an Energy Star rating. I h
Basement Levels in ASHRAE 90.1 Energy Models
CS-2009 EAp2:Minimum Energy Performanceposted by Ciaran McCabe on
Hi, I am modelling a 6 storey office building which also has a basement car park.
Occupants / users of public park
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Deborah Lucking on
Our project includes the creation of a park, and construction of a pavilion with restrooms for park users. The challenge - how do we calculate the number of FTEs using these restrooms?