Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

GC Responsible for Implementing Option B?

NC-2009 EAc5:Measurement and Verification
posted by  Marcia Weekes  on 

Does anyone have any experience with projects where a GC has been given the responsibility for implementing the M&V credit using Option B?

6
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Thu Sep 8, 2016, 3:29 pm

A material with zero VOC content

NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealants
posted by  dia2000@gmail.com dia2000@gmail.com  on 

Hello, We are submitting data about certain materials that has "zero" VOC content according to manufacturer's datasheet.

4
Wed Sep 7, 2016, 9:19 pm

Anti-Rust vs flat primer

NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatings
posted by  Michelle Raigosa  on 

Does anyone have any insight/thoughts/comments/experience about categorizing an anti-rust coating as compared to categorizing the product as a flat coating/primer?

6
Director of Sustainability
Leopardo Companies, Inc.
LEEDuser Basic Member
12 thumbs up
Wed Sep 7, 2016, 8:05 pm

Loading dock and parking to be counted in Gross Floor Area?

NC-2009 PIf2:Project Summary Details
posted by  Deborah Lucking  on 

Until last week I was pretty sure that all parking whether enclosed by the building, or on the roof of a building should be excluded from the Gross Floor Area number.

4
Director of Sustainability
Fentress Architects
LEEDuser Expert
224 thumbs up
Tue Sep 6, 2016, 10:00 pm

No Permanent Irrigation System

EBOM-2009 WEc3:Water Efficient Landscaping
posted by  Kevin Sullivan  on 

Hi we are attempting this credit for one of our existing schools project.The project does not have permanent irrigation system.The landscape area is irrigated manually by the facility staff member

4
Tue Sep 6, 2016, 6:41 am

Enhanced Cx - Submittal reviews - HVAC&R only?

NC-v4 EAc1:Enhanced commissioning
posted by  André Harms  on 

In reference to the V4 LEED Reference Guide for Building Design and Construction, Enhanced Commissioning section: In the Step-by-Step guidance, “Step 4.

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Fri Sep 2, 2016, 4:01 pm

ASHREA 0-2005

NC-v4 EAc1:Enhanced commissioning
posted by  Amrit Kaur  on 

Any one knows where I can get the referenced 0-2005 standard? officially its no longer available from ASHREA and superseded by 0-2013. Any idea how different they may be?

2
Regional Director
Horizon Engineering Associates
LEEDuser Premium Member
40 thumbs up
Fri Sep 2, 2016, 3:52 pm

Energy Star eligibility for very large Display Monitors

CI-2009 EAc1.4:Optimize Energy Performance—Equipment and Appliances
posted by  Harry Flamm  on 

Nowhere on the Energy Star site can I find out if 75" wide and larger Professional Display Monitors (such as Samsung or NEC for conference rooms) are eligible or not for an Energy Star rating. I h

2
Fri Sep 2, 2016, 1:44 pm

Basement Levels in ASHRAE 90.1 Energy Models

CS-2009 EAp2:Minimum Energy Performance
posted by  Ciaran McCabe  on 

Hi, I am modelling a 6 storey office building which also has a basement car park.

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Fri Sep 2, 2016, 1:41 pm

Occupants / users of public park

NC-2009 WEp1:Water Use Reduction—20% Reduction
posted by  Deborah Lucking  on 

Our project includes the creation of a park, and construction of a pavilion with restrooms for park users. The challenge - how do we calculate the number of FTEs using these restrooms?

5
Director of Sustainability
Fentress Architects
LEEDuser Expert
224 thumbs up
Thu Sep 1, 2016, 8:50 pm