Forum quick links
Supporting Documents for EAp2 and EAc1
CS-2009 EAc1:Optimize Energy Performanceposted by Alice chen on
Hi all, I am working on a LEED 2009 NC project with IES energy modelling. Could anybody advise what documents need to be submitted for EAp2 and EAc1 certifications?
Dates of Documentation
CI-v4 MRp2:Construction and demolition waste management planningposted by Kerry Honsinger on
Does LEED track the dates of documentation that is required to be uploaded?
Trane TRACE's 40 plant limit.
Schools-2009 EAp2:Minimum Energy Performanceposted by Kelsey Rightmer on
The school I am modeling has a vrf system served by dedicated outdoor air energy recovery units as well as packaged rooftop units.
Core & Shell without HVAC or electrical systems
CS-2009 MPR2:Must be a complete, permanent building or spaceposted by Celia Puertas Romero on
We would like to pursue LEED Core & Shell certification for a building undergoing a major renovation.
Rennovation with small addition
NC-2009 EAp2:Minimum Energy Performanceposted by Stephanei Mezynski on
I am working on a project that is 15,00 sqft renovation and 8,000 sqft new construction (addition).
Primer Sealer VOC Content
CI-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Jordan Kirrane on
I have a water based primer sealer that the client is looking to use in order to fix artwork to the walls throughout their floors.
AHUs unable to meet case 1 or case 2
EBOM-2009 IEQp1:Minimum IAQ Performanceposted by Patrick Murisset on
Hello. I coordinated a project in which the IEQp1 was audited.
Campus
Pilot-Credits PC14:Walkable Streetsposted by Megan Recher on
We are applying the pilot credit in a campus setting, where the primary façade fronts a pedestrian plaza, as opposed to street.
Multiple Identical Clothes Washers
Healthcare-v2009 WEp1:Water use reductionposted by MURAT DOĞRU on
In our project, we have 7 identical clothes washers. Do we have to add them to Table WEp1.6 as separate rows or just write the overall water use rate, equipment cf, etc parameters in a single row?
Unfinished Spaces Baseline and Proposed System
NC-2009 EAp2:Minimum Energy Performanceposted by Phil Stafa on
Hello: I have a 3 story mixed use healthcare facility with offices, exam rooms, treatment rooms, research areas, and a surgical suite.