Forum quick links
Steel extraction location
NC-2009 MRc5:Regional Materialsposted by Tiffany Moore on
I feel like broken record on this topic, because I know I've been through this before.
Pre-Owned furniture
CI-2009 MRc4:Recycled Contentposted by Susan Di Giulio on
If a project is using less than 30% of the furniture budget's worth of pre-owned furniture, and thus not attempting MRc3.2, can that be used towards MRc4 instead?
SRI required testing amounts
NC-2009 SSc7.2:Heat Island Effect—Roofposted by Anna Korinkova on
Hello, could anybody tell me how we can state the number of SRI tests on a project? We intend to place gravel on the roof and provide a concrete parking log.
Workspace opens to exterior and interior
NC-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by Peter Doo on
We have a project that includes a workshop/studio space.
Parking Garage above Non LEED Building
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Kar Kerman on
I'm not sure whether I can (or should) include a parking garage in a project I'm working on. The parking garage is located in an adjacent building and has a separate owner.
Building core concrete floors as a "reused" material?
CI-2009 MRc3.1:Materials Reuseposted by Alex Silber on
Office TI project in a downtown high rise building - rather than installing a finish floor product (e.g.
Solvent free Coating
NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Panupant Phapant on
If our project use solvent-freee coating. Do we still need VOCs testing result from our supplier?
Solar PV System Degradation
NC-2009 EAc2:On-Site Renewable Energyposted by Katherine Ann Resurreccion on
Our Solar PV system supplier provided us a calculation of how much solar energy is generated per annum. It is projected that there will be a solar degradation factor of 1% each year.
Different outdoor air flow rates between Models
Data-Centers-NC-v4 EAp2:Minimum energy performanceposted by Santiago Rodriguez on
Hello, We hace just received the preliminary review comments for a Data Center.
Massage/Sauna/Swimming pool
NC-2009 IEQc8.2:Daylight and Views—Viewsposted by LEED Pro Consultant on
Hello, we are working on a residential project and we would like to know if amenities such as sauna, massage and swimming pool areas are considered as regularly occupied areas. Thank you.