Single parking space for the project.
NC-2009 SSc4.3:Alternative transportation - low-emitting and fuel-efficient vehiclesposted by kelly ryan on
For our current project we are allocating One parking space for the project. This space will be indicated as an accessible space.
Landfill remediation
NC-2009 SSc3:Brownfield redevelopmentposted by Michael Archer on
Under what circumstances does a commercial project need to be remediated to meet residential (unrestricted) use?
Sealants and Adhesives applied offsite
NC-2009 IEQc4.1:Low-emitting materials - adhesives and sealantsposted by Marcio Alberto Casado Pereira on
I will ask my question with a couple of examples: adhesives and stains applied offsite to wood doors and wood windows have to comply with the credit? or only if they are applied onsite?
EA P2 data requirement
EBOM-2009 EAp2:Minimum energy efficiency performanceposted by ravi singh on
Can anyone help me regarding the EA C1 performance period. My project is already certified under LEED NC now going for EBOM , then what will be my performance period for EA C1.
basecourse ,bedding sand and subbase materials
NC-2009 MRc4:Recycled contentposted by Benjie Herrera on
Are these materials-basecourse,bedding sand and subbase materials have recycled content? Can they also be qualified for Regional materials?
re-upholstering of furniture
posted by SIG - Sustainability Main Account on
how do you quantify re-upholstering of furniture? if the base of the chair is re-used, and new fabric is installed. my best guess is to classify the item as 50% salvaged?
OFF Site Application
CI-2009 IEQc4.1:Low-emitting materials - adhesives and sealantsposted by Gayle Borst on
So without my knowing it, the contractor had laminate applied off site to some cabinets- our LEED Reviewer flagged the fact that we had left out contact adhesive but had included the laminate on ou
For Assemblies - What is the Location of Extraction?
CI-2009 MRc5:Regional materialsposted by Melissa Wrolstad on
My client has a chair which was manufactured within 500 miles of the project site. The chair is composed of foam (5%), plastic (2%), wood (13%) and steel (80%) by weight.
What to measure?
CS-2009 EAc5.1:Measurement and verification - base buildingposted by Marcio Alberto Casado Pereira on
We are working on a multiple building campus, it's a residential project.
Amount of recycling generated
NC-2009 MRp1:Storage and collection of recyclablesposted by SmithGroup BG+LU FW on
Has anyone found baseline data for amount of recycling generated in an office?