Forum quick links
Pool Cover and Air souce heat pump
NC-2009 EAp2:Minimum energy performanceposted by Arub Vijay on
Can the mandatory requirement of swimming pool cover be exempted if an air-souce heat pump is used for pool heating? The pool is heated to 30 ºC, is the pool cover mandatory in this case.?
Particulate Matter Removal
CS-2009 IEQp1:Minimum indoor air quality performanceposted by Paula Hernandez on
Hi to all of you, as per Standard 62.1-2007, in Section 5.9, one of the minimum requirements for mechanically ventilated spaces, a MERV 6 filter shall be provided upstream of all cooling coils.
Radiant Heat Mats
CI-2009 EAp2:Minimum energy performanceposted by Holly Himes on
Has anyone used these on a project and which credit would then fall under if any?
Developing the plan post-construction
NC-2009 EAc5:Measurement and verificationposted by Maura Adams on
Is there any reason that we couldn't develop an M&V plan post-construction, assuming we have the necessary controls in place?
Bypaas VAVs and AHUs
CI-2009 EAc1.3:Optimize energy performance - HVACposted by monu goyal on
Hello to all, my query is our project is two floors in a 9 floor building. The base building developer has provided AHUs and chilled water supply.
IAQ Testing AFTER Occupancy?
CI-2009 IEQc3.2:Construction IAQ management plan - before occupancyposted by buddy pribish on
I am aware of the verbiage in the LEED reference guide for IAQ testing to be completed PRIOR to occupancy, but considering that the flushout method can be completed DURING occupancy, I was wonderin
Shower for a transportation hub
NC-2009 SSc4.2:Alternative transportation - bicycle storage and changing roomsposted by Kevin Meyer on
We are working on a transportation hub next to a stadium. The project won't have any full time employes on site.
Active Design- LEED ID credit Physical Activity- LEED NC & CI
CI-2009 IDc1:Innovation in designposted by Baani Singh on
You can earn a LEED ID credit by promoting Physical activity in your building. Most of the strategies are already in LEED CI& NC.
Red Alert on Equipment Metric Review Trend
EBOM-2009 SSc2:Building exterior and hardscape management planposted by Jenny Carney on
All, we've seen a trend from the review side that we want to share so that folks can be prepared.
Medical Equipment: Pilot Credit, LEED Point, Incentive Programs?
Pilot-Credits EApc3:Medical and process equipment efficiencyposted by Catherine Pana on
I work for GE Healthcare and we recently introduced a new CT (Cat-Scan) Scanner to the market that is 60% more electrically efficient.