Post a question or comment
Credit Filters
Optimize Energy Performance—Equipment and Appliances
Filter by location
Forum
Topic
Replies
Recent

ENERGY STAR UPS - 160KW and 480V

CI-2009 EAc1.4:Optimize Energy Performance—Equipment and Appliances
posted by  Carla Lopez  on 

Hi, It is of my best understanding that the UPSs are included as "eligible equipment" for both EAp2 and EAc1.4 as stated on the LEED for Commercial Interiors v2009 Reference Guide since they fall

7
Senior Sustainability Manager
JLL
LEEDuser Basic Member
10 thumbs up
Thu Nov 8, 2018, 7:55 pm

exclusions

CI-2009 EAc1.4:Optimize Energy Performance—Equipment and Appliances
posted by  Nate Maniktala  on 

Hi there, I was wondering if there are exclusions to some of the pieces of equiptment that would qualify as Energy Star?

1
Thu Jun 7, 2012, 11:39 pm

CUP in group project

CI-2009 EAc1.4:Optimize Energy Performance—Equipment and Appliances
posted by  Brightworks Sustainability  on 

I'm working on CI group project that is also using a central utility plant. My understanding is that each building must show compliance individually for lighting power density reduction.

1
Tue Apr 12, 2016, 1:45 pm

Server Room Equipment

CI-2009 EAc1.4:Optimize Energy Performance—Equipment and Appliances
posted by  Matthew Macko  on 

Is there a list of the types of Energy Server Room Equipment to include in the calculations? For example, do we need to include WLAN controllers, control systems, etc.?

1
Wed Aug 22, 2012, 8:51 pm

Energy star

CI-2009 EAc1.4:Optimize Energy Performance—Equipment and Appliances
posted by  Yaser Al Sharif  on 

I am working on cl commercial project , when we resisted to the leed certificate we didn't have any energy star equipment's in our building , but to achieve more points we decided to replace our eq

0

Lease Versus Purchase

CI-2009 EAc1.4:Optimize Energy Performance—Equipment and Appliances
posted by  Kristopher Croghan  on 

Does leased equipment still need to comply with credit?

1
Mon Jan 30, 2017, 9:58 pm

Tenant Installed Equipment and Appliances

CI-2009 EAc1.4:Optimize Energy Performance—Equipment and Appliances
posted by  James Keohane  on 

I am working on a project wherein the equipment and appliances are installed by the tenant AFTER completion. I can get date from tenant/agency on proposed equipment.

1
Wed Dec 23, 2015, 5:35 pm

Non ES rated Oven project in europe

CI-2009 EAc1.4:Optimize Energy Performance—Equipment and Appliances
posted by  Cyril Knabe-Nicol  on 

Hello everyone, I have a LEED CI in europe and i have an issue with an oven, it is non ES rated and the manufacturer do not have any information in btuh.

1
Tue Jun 26, 2012, 5:44 pm

fitness centre equipment

CI-2009 EAc1.4:Optimize Energy Performance—Equipment and Appliances
posted by  Jutta Berns  on 

We are busy with a fitness centre project and looking to confirm which appliances/equipment we typically would have to include in this credit.

1
Tue Jul 1, 2014, 3:19 pm

ID Credit for CSv 2009 Project

CI-2009 EAc1.4:Optimize Energy Performance—Equipment and Appliances
posted by  José Solis  on 

Is it possible to use this credit as an ID credit for a CS v2009 project? Could we achieve it if we write the requirements into the tenant lease language or the binding tenant requirements?

1
Tue Mar 22, 2016, 10:21 pm