Forum quick links
Existing Fixtures Calculated in Installed Lighting Power?
CI-2009 EAc1.1:Optimize energy performance - lighting powerposted by David Rodriguez on
I have a renovation project where there are three rooms in which we are not replacing the light fixtures.
LPD Calculation Technical/Plant/Maintenance Rooms
CI-2009 EAc1.1:Optimize energy performance - lighting powerposted by Ian McCall on
Dear all, Are technical, plant, maintenance, goods stockage rooms included in this LPD (Lighting Power Density) calculation? Are staff stairwells included? Thank-you Ian
Exemptions
CI-2009 EAc1.1:Optimize energy performance - lighting powerposted by Andreas Gyr on
I am working on an international project that has novelty lighting and lighting that displays cafe food. Are either of these exempt from EAc1.1?
EAp2
CI-2009 EAc1.1:Optimize energy performance - lighting powerposted by Peter Doo on
If I have an Interior Lighting COMcheck completed for a project, is that sufficient enough for upload or do I still have to provide the Lighting Compliance Documentation Interactive Compliance Form
Gross Lighted Area - ASHRAE 90.1-2007
CI-2009 EAc1.1:Optimize energy performance - lighting powerposted by Trevor Karstens on
This topic was previously posted under EAp2, but was not getting any responses; this seems like the more relevant location anyways: I'm encountering difficulty in documenting the minimum 10% light
Lighting Power Density
CI-2009 EAc1.1:Optimize energy performance - lighting powerposted by Yaser Al Sharif on
Hi everybody, for lighting power density calculations, i was wondering about the additional lighting power density; how can we provide that the project includes specific lighting functions, and onl
I'm working on finalizing
CI-2009 EAc1.1:Optimize energy performance - lighting powerposted by Heather Anderson on
I'm working on finalizing documentation for a LEED project. We have completed the calculations and are only looking about 15% savings.
CUP question
CI-2009 EAc1.1:Optimize energy performance - lighting powerposted by Brightworks Sustainability on
We have a group CI project - 4 floors of one building and 1 smaller floor of a second building.