CI-2009 SSc1:Site Selectionposted by Mike D on
Hello, If attempting Path 9, do the fixtures of the tenant space need to be included as well or do just the ones in the base build need to be included? Many thanks!
Cooling Tower
CI-2009 SSc1:Site Selectionposted by Kristopher Croghan on
Our CI client owns the building they're in and are looking for additional water savings, beyond the water savings as outlined in LEED CI WEc1.
SSc1 Option 2, Path 4: Heat IE-Nonroof - Parking Stall Calc.
CI-2009 SSc1:Site Selectionposted by Michelle Bracewell-Musson on
The tenant is taking 19000 sf of a 100,000 sf existing building and making it CI. There are 60 underground parking stallas and about 200 outside (unshaded).
SSc1 Path 7 Water Efficient Landscaping
CI-2009 SSc1:Site Selectionposted by Brian Kelly on
We are doing a renovation on a hospital in Las Vegas NV. The hospital has two very small patches of landscape that use what we believe to be an efficient irrigation system.
Regional Priority on this credit
CI-2009 SSc1:Site Selectionposted by Katie Peterschmidt on
Hello - I'm doing a tenant guideline for our C&S project and want to make sure I'm leading the tenants properly in what they can automatically achieve.
Path 6
CI-2009 SSc1:Site Selectionposted by Nelina Loiselle on
Does anyone have a sample of a sequence of operations narrative? I am not sure what they'd like to see.
Path 4
CI-2009 SSc1:Site Selectionposted by Mike D on
Can the project achieve Path4 if there are no parking spaces within the building. The project is a zero lot line as well. Thanks!
Reopening one path of LEED-CI SSc1.2 in Construction Review
CI-2009 SSc1:Site Selectionposted by Susan Di Giulio on
In preliminary design review, we had attempted the Brownfields point, which is an option in SSc1.2.1, as well as 4 other points in that credit.
Exemplary Performance
CI-2009 SSc1:Site Selectionposted by Méabh Browne on
Apologies if this has already been addressed, but I'm confused about how this works - if my project has already got 5 points in other Paths in this credit, can I get an additional (6th) point for e