Mixed use: Production; Shipping/Receiving; R/D; Office Space

EBOM-2009 IEQp1:Minimum IAQ Performance
posted by  Aaron Nelson  on 

The building has four space types and 20 AHUs. The building lacks any integrated controls, so each AHU operates independent of the other.

1
Tue Dec 11, 2012, 6:47 pm

Fresh air from different AHUs for the same room

EBOM-2009 IEQp1:Minimum IAQ Performance
posted by  Shadi Sobh  on 

hi all, An existing case were the floor is feed by two (2) variable AHU’s, and a specific room is supplied via two (2) VAVs and each VAV is connected to a different AHU; while calculating the fre

1
Wed Jul 10, 2013, 2:25 pm

Exhaust Fans in Production area

EBOM-2009 IEQp1:Minimum IAQ Performance
posted by  Janna Nash  on 

For LEED EBOM 2009, IEQp1, are exhaust fan test reports required for every fan or just one per type.

1
Mon Aug 11, 2014, 5:42 pm

Fresh Air Measurements on Rooftop Units

EBOM-2009 IEQp1:Minimum IAQ Performance
posted by  Christopher Pinkowski  on 

I am applying this credit to ten rooftop units that lack a straight duct section long enough to traverse with a pitot tube.

0

Adequate measurement equipment and procedures

EBOM-2009 IEQp1:Minimum IAQ Performance
posted by  CAIO DE MELO  on 

We are working on an office building with fan-coils units conditioning office spaces on typical floors and several multi-split ceiling cassette units conditioning technical occupied areas (maintena

1
Wed Jan 30, 2013, 2:24 pm

Airflow testing service

EBOM-2009 IEQp1:Minimum IAQ Performance
posted by  Saul Pichardo, AIA  on 

Hi All, We are looking for a company in the San Francisco Bay Area who can conduct the airflow tests in our commercial building (in the office area). We are working on a LEED O&M project.

0
1
Fri Jul 30, 2010, 4:53 pm

Occupancy rates

EBOM-2009 IEQp1:Minimum IAQ Performance
posted by  Nelina Loiselle  on 

I am not sure why it says on the documentation screen shot that the total occupancy for the VRP calcs should be consistent with occupancy for other credits.

1
Thu Apr 11, 2013, 7:49 pm

Measurement at DOAS before fixed dampers

EBOM-2009 IEQp1:Minimum IAQ Performance
posted by  Noriko Nagazumi  on 

From the reference guide: "Show compliance with the applicable requirement above through measurements taken at the system level (i.e., the air-handling unit).

1
Fri Apr 11, 2014, 8:14 pm

ASHRAE 62MZ calculator

EBOM-2009 IEQp1:Minimum IAQ Performance
posted by  Mark Frey  on 

I try to fill out the ASHRAE 62MZ calculator and have some problems with it: 1) We have lots of AHUs in our building (Some Vanitlation systems, some AC-systems and some are only exhaust systems).

1
Wed Jan 18, 2012, 4:11 pm