NC-2009 MRc4:Recycled Contentposted by Maura Adams on
Do I need to enter every single material used into the spreadsheet, or can I stop once I've reached the 10% or 20% threshold? Please tell me it's the latter!
Concrete pre or post consumer
NC-2009 MRc4:Recycled Contentposted by Albert Sagrera on
I would like to know how you can consider a concrete which has returned to the production plant without being used in the construction. Can be a residue pre or post consumer? Thanks.
How to calculate Percentage of recycled content?
NC-2009 MRc4:Recycled Contentposted by Sahar Abi-Ziki on
Hello, I need a clarification on how to calculate the percentage of recycled content for a specific material on my project. For example; My fiber glass insulation has 9% post consumer recycled cont
EPP certification for proof of recycled content?
NC-2009 MRc4:Recycled Contentposted by Renee Shirey on
Has anybody ever had an issue with using an EPP certified product to gain recycled content for a project?
Materials Which Always Get Review Comments
NC-2009 MRc4:Recycled Contentposted by Hernando Miranda on
It is obvious that the LEED reviewers use a set of predetermined comments for certain material claims made.
What to consider as toilet accessories?
NC-2009 MRc4:Recycled Contentposted by Marcio Alberto Casado Pereira on
CSI Section 10 is included in this credit. What would be considered toilet/bath acessories under CSI 10 28 00?
Demolished Concrete to be reused as fill for MRc4
NC-2009 MRc4:Recycled Contentposted by Greengrade User on
We are currently working on a multiphase development in which the foundation of one building is being completed while another is being demolished.
Calculating material use for mock-ups.
NC-2009 MRc4:Recycled Contentposted by Peter Doo on
When working on large projects with substantial mock-ups, should one include these materials in the project documentation?
Reused aggregate base on site
NC-2009 MRc4:Recycled Contentposted by jim bell on
Our project in Guam used base material extracted on site and gradated for reuse as aggregate sub-base below slabs and pavement on site.