Crawlspace and Attic Classification

NC-2009 EAp2:Minimum Energy Performance
posted by  Joseph Chappell  on 

I am working on an existing building renovation where there is a significant amount of building floor area that is crawlspace and attic area.

1
Fri Jun 16, 2017, 7:26 am

24-hour lighting

NC-2009 EAp2:Minimum Energy Performance
posted by  Bill Swanson  on 

I looked thru all 2000+ comments and didn't see this addressed. I have a hotel project with a pool, fitness room, vending/ice machines, ect.

1
Mon Mar 10, 2014, 7:05 pm

Window to wall ratio

NC-2009 EAp2:Minimum Energy Performance
posted by  Katherine Ann Resurreccion  on 

I’m working on project with two mid-rise buildings, one for the office and the other is for parking garage mostly are naturally ventilated.

1
Fri Mar 23, 2012, 12:53 pm

Unfinished Spaces Baseline and Proposed System

NC-2009 EAp2:Minimum Energy Performance
posted by  Phil Stafa  on 

Hello: I have a 3 story mixed use healthcare facility with offices, exam rooms, treatment rooms, research areas, and a surgical suite.

1
Tue Jul 19, 2016, 3:22 pm

Proposed case outside airflow rates

NC-2009 EAp2:Minimum Energy Performance
posted by  Cagril Comert  on 

Hi, Our office building is ventilated with a constant volume AHU and conditioned by VRF system. AHU supplies 100% fresh air to the spaces, while VRF system provides heating and cooling.

1
Tue Jul 11, 2017, 3:54 pm

Continuous Insulation and Appendix A

NC-2009 EAp2:Minimum Energy Performance
posted by  Paul Diaz  on 

I have wall assemblies with no cavity insulation but 3-4 inches rigid insulation outboard of structural sheathing. The wall is finished by a composite metal panel.

1
Thu Apr 24, 2014, 12:46 am
1
Wed Dec 8, 2010, 4:43 pm

VRP Compliance Calculator

NC-2009 EAp2:Minimum Energy Performance
posted by  Vassil Vassilev  on 

Greetings, Regarding VRP Compliance Calculator (IEQp1), there is a question on how to enter an AHU having the following characteristics: The AHU is a constant volume device; supplying to several

1
Fri Nov 13, 2015, 8:02 pm

Garage ventilation - Baseline

NC-2009 EAp2:Minimum Energy Performance
posted by  Vassil Vassilev  on 

Greetings, There are some more details about this issue, for which I'd appreciate very much some clarifications. Regarding the modeling approach for garage ventilation in the Baseline, it should fo

6
Wed Aug 23, 2017, 12:29 pm

Parking garage ventilation - Proposed vs. Baseline

NC-2009 EAp2:Minimum Energy Performance
posted by  Vassil Vassilev  on 

Hi Markus, Following our correspondence as of Jul/13/2017, we've modeled the garage ventilation claiming some energy savings. We've provided explanation reflecting all details including all conside

9
Fri Aug 11, 2017, 1:43 pm