Exceptional Calculations
NC-2009 EAp2:Minimum energy performanceposted by Stephen DeGrazio on
I have a new bubilding which will be mostly a performing arts theater and school gymnasium.
additional heating system
NC-2009 EAp2:Minimum energy performanceposted by Alfonzo Collins on
I am working on a high-rise residential building with VRF. The building envelope is heavily glass, so the owner has decided to also install a hydronic heating system at the building perimeter.
Brewery Process Load - Baseline and Proposed Case Set-up
NC-2009 EAp2:Minimum energy performanceposted by Xun Jia on
The brewery I am modeling has large percentage of energy consumption associated with the process load.
Energy Recovery for Baseline Air Handling Units (LEED 2009)
NC-2009 EAp2:Minimum energy performanceposted by Craig Hossfeld on
My proposed design has multiple AHUs supplied from a dedicated outside air AHU (DOAS) . The DOAS will be over 20,000 cfm and will have energy recovery.
Does a Party wall count for the Window to wall ratio?
NC-2009 EAp2:Minimum energy performanceposted by Zonda E. Team on
Hi there, Im modelling a corner building, which has two adjacent buildings so only the façades facing the street are in contact with the exterior environment.
IES ApacheHVAC - Proposed system for VRF
NC-2009 EAp2:Minimum energy performanceposted by Alice chen on
Hi All, I am modelling a VRF system using ApacheHVAC in IES. But have no idea which prototype to choose.
Crawlspace and Attic Classification
NC-2009 EAp2:Minimum energy performanceposted by Joseph Chappell on
I am working on an existing building renovation where there is a significant amount of building floor area that is crawlspace and attic area.
24-hour lighting
NC-2009 EAp2:Minimum energy performanceposted by Bill Swanson on
I looked thru all 2000+ comments and didn't see this addressed. I have a hotel project with a pool, fitness room, vending/ice machines, ect.
Window to wall ratio
NC-2009 EAp2:Minimum energy performanceposted by Katherine Ann Resurreccion on
I’m working on project with two mid-rise buildings, one for the office and the other is for parking garage mostly are naturally ventilated.
Unfinished Spaces Baseline and Proposed System
NC-2009 EAp2:Minimum energy performanceposted by Phil Stafa on
Hello: I have a 3 story mixed use healthcare facility with offices, exam rooms, treatment rooms, research areas, and a surgical suite.