Mon Jul 13, 2015, 6:34 pm

CONFUSED IN EAP2 STRATEGY FOR A MASTER SITE PROJECT

NC-2009 EAp2:Minimum Energy Performance
posted by  VEL MUTHU  on 

Hello everyone, I am currently working on a project which consist of 8 buildings(3 main buildings and 5 supportive building, all are between 8000 to 60,000 sq ft), we are targeting certification le

1
Thu May 26, 2016, 3:16 pm

Baseline system selection

NC-2009 EAp2:Minimum Energy Performance
posted by  MKK LEED  on 

I have a building that is roughly 20,000ft2 of office, plus another 13,000ft2 of underground parking that is heated to 50F.

1
Tue Feb 14, 2017, 12:10 am

ASHRAE 90.1 2007-LIGHTING

NC-2009 EAp2:Minimum Energy Performance
posted by  Stella Stella  on 

Does ASHRAE 90.1 2007 have any code compliance for interior lighting LUX levels ?

1
Sun Nov 2, 2014, 11:39 pm

District heating with renewable energy. Baseline?

NC-2009 EAp2:Minimum Energy Performance
posted by  Francesco Passerini  on 

I'm modeling a district heating system according to option 2 of “Treatment of District or Campus Thermal Energy in LEED V2 and LEED 2009 – Design & Construction”.

1
Wed Aug 12, 2015, 2:43 pm

90.1-2007 Table G3.1.1A for Additions and Alterations

NC-2009 EAp2:Minimum Energy Performance
posted by  Evelyn Dicks, EI, CxA  on 

Do the requirements of Table G3.1.1A Baseline HVAC System Types apply to the whole building or just to the project area for additions and alterations?

1
Tue Jan 31, 2012, 10:30 pm

Appendix G-Baseline HVAC System

NC-2009 EAp2:Minimum Energy Performance
posted by  Kristin Heinz  on 

Our project is a bed-and-breakfast with guest rooms that are conditioned using PTHP units. A VRF system conditions the common areas with a DOAS that uses a chiller and hot water boiler.

1
Tue Nov 20, 2012, 12:24 am

Baseline HVAC Selection

NC-2009 EAp2:Minimum Energy Performance
posted by  April Rice  on 

We have a 5 story non-residential building (located on a campus), with a mechanical penthouse (with roof) above.

1
Thu Mar 1, 2012, 12:58 pm

Baseline System 9 fan details

NC-2009 EAp2:Minimum Energy Performance
posted by  Vassil Vassilev  on 

Greetings, We have zones in our project which are addressed to system 9 (heating only).

1
Tue Jul 5, 2016, 1:48 pm

Part Residence and Part Office

NC-2009 EAp2:Minimum Energy Performance
posted by  April Ambrose  on 

I have a small facility (20k sqft or so) that is approximately 45% office and 55% "transitional" residential. I've modeled it as a residential with PTAC w/ HW Coil per zone, but I'm running into a

1
Thu Dec 6, 2012, 7:26 am