EAp2 - Design and Buildt Contract
NC-2009 EAp2:Minimum Energy Performanceposted by André Knutsson on
Consto have a Design and Buildt Contract with the project owner. The Architects contracts is a part of the contract. His role in the project is design and drawing.
Both electric heat pump and district energy, what system?
NC-2009 EAp2:Minimum Energy Performanceposted by Emma Eliasson on
I have a multifamily building which is supplied with heat from both an electric heat pump and district energy. How do I choose between system 1 and 2? Which rules do apply?
Baseline Model Exterior Lighting
NC-2009 EAp2:Minimum Energy Performanceposted by Jean Marais on
Okay, the baseline model has no overhangs and canopies, but the design has.
Using PHPP for EAp2/EAc1 modeling
NC-2009 EAp2:Minimum Energy Performanceposted by Lyle Axelarris on
Is it possible to use PHPP software (Passive House Planning Package) for energy modeling on a LEED-NC project? Does anyone have experience with this?
EA p2 Section 1.4.xls
NC-2009 EAp2:Minimum Energy Performanceposted by Sari Kujawa on
First time submitting NC 2009 V3 forms. Filling out the EAp2 Section 1.4. xls file.
EAp2- Energy Modelling and Process Loads
NC-2009 EAp2:Minimum Energy Performanceposted by Marcio Alberto Casado Pereira on
Hi, I am working on a project (Stadium) where the only significative improvement on energy performance is lighting because the COP of the HVAC is basically the same and the envelope is not much
EAp2-Natural Ventilation v/s No HVAC
NC-2009 EAp2:Minimum Energy Performanceposted by Marcio Alberto Casado Pereira on
I am trying to determine if a project of an Industry ( "New Construction") without HVAC system get some special credit or if it is possible to obtain the 10% improvement between Baseline and Propos
Automatic Lighting Shut-off in Hotel Guest rooms
NC-2009 EAp2:Minimum Energy Performanceposted by Arub Vijay on
I have a hotel building with 150 keys aiming for LEED Silver..can anybody advise if all the guest rooms shall have automatic lighting shut-off controls (occupancy sensors, key/card controlled etc).
Modeling a unique HVAC System
NC-2009 EAp2:Minimum Energy Performanceposted by matthew strong on
We have a campus project that has a unique HVAC system for cooling that reuses return water from a central plant that has already circulated to other campus buildings.
Energy coming from a off-site own renewable source
NC-2009 EAp2:Minimum Energy Performanceposted by Jose Salinas on
Our project involves a production plant for pasta and support facilities in Santiago, Chile.