CS Project with no ref equipment
CS-v4 EAc6:Enhanced refrigerant managementposted by Martin Stowell on
I am working on a CS project and the drawings do not have any planned ref equipment since this will be at the tenants discretion to decide at a later date. If our plans do not include ref equipmen
Certify only one floor among three floors that are rented
CI-v4 MPR2:Must use reasonable LEED boundariesposted by Diana Nezamutinova on
Would you please advise if one newly acquired floor of a 3-floor office eligible to get certified under LEED v.4 Commercial Interiors (see details below)? - A company XYZ has been renting 2 adjac
LEED EB O&M Certification - optimized energy performance
Data-Centers-NC-v4 EAp2:Minimum energy performanceposted by satheesh M on
I want to register a project in LEED EB. my project contains 3 buildings in a 8 building campus.
ETS During Construction
NC-v4 EQp2:Environmental tobacco smoke controlposted by L W on
Does the ETSC prerequisite apply during construction as well?
Site Management Policy but No Landscaping
EBOM-v4 SSp1:Site management policyposted by Nitesh Kumar J on
I'm looking for some guidance regarding Site management policy. There is no scope of landscaping or soil in the existing site, then how do we attempt this prerequisite.
Sound transmission for moveable partitions
NC-v4 EQc9:Acoustic performanceposted by Anaïs P on
Do the requirements about sound transmission have to be applied for moveable partitions in open-plan office? Achieving the STC values from table 1 betweeen two standards offices separated by a move
Integrative Process-Simple box C&S v4
CS-v4 IPc1:Integrative processposted by Giuseppina Amorusi on
Hi all, I and my team are working on LEED v4 BD+C project, and we're looking to pursue the Integrative Process credit for Core and Shell certification. We have an existing building where we will do
Documentation
Healthcare-v4 MRp3:PBT source reduction - mercuryposted by David Dixon on
Working on a v2009 BD+C project and using the credit as an ID credit looking for information on accepted documentation. Any insight will be helpful
Rainwater management - Filters
NC-v4 SSc4:Rainwater managementposted by Jorge Mato Rial on
Hello Everyone! I am working in a project, which includes the following types of surfaces: -Impervious roof areas -Garden areas -Impervious vehicle circulation areas -Parking area with green paveme
Reuse of existing building materials in the building parking lot
NC-v4 MRc1:Building life-cycle impact reductionposted by Greenlab on
Hi. In option 3 of this credit “Building and Material Reuse” we must reuse or salvage building materials from off site or on site as a percentage of the surface area.