Forum quick links
Trane Trace Reports
NC-v4 EAp2:Minimum energy performanceposted by Ciaran McCabe on
FPL OnCall in South Florida
NC-v4 EAc4:Demand responseposted by Joseph Snider on
In South Florida, our local utility, Florida Power & Light (FPL), has a program call Business On Call. They set it up so they can turn off your A/C for short periods of time..."up to 17.5
Approved Bicycle Storage
NC-v4 LTc6:Bicycle facilitiesposted by Summer Minchew on
I read and understand the USGBC guidance regarding the selection of bike racks, that “Bicycle racks should reflect best practices in design and installation.
Public lavatory (restroom) faucet water sense?
CI-v4 WEp1:Indoor water use reductionposted by Carlos Dobobuto on
Hi, we are looking for a Public lavatory (restroom) faucet with water sense label but all we have found have higher consuption that the base line.
How long after a project is completed can credits be submitted?
Healthcare-v4 INc1:Innovationposted by Stephanie Kreps on
If a new construction project is already registered in LEED online, can the credit submittal process begin after the building has been completed?
Are Shades 'Furniture and Furnishings'?
CI-v4 EQc2:Low emitting materialsposted by Julie Hendricks on
Motorized and manual shades (such as Mechoshade) are in Division 12. Do they count as "stand-alone furniture items" that must be included in low-emitting materials calculations?
NAF Composites Not CARB
NC-v4 EQc2:Low emitting materialsposted by Michelle Rosenberger on
There are particleboard products that are NAF with third party certifications that LEED reviewers will not accept because they do not have a CARB exempt executive order.
Demand Response Plan - who creates the plan?
NC-v4 EAc4:Demand responseposted by Deborah Lucking on
We have a mechanical engineer, an electrical engineer, a commissioning agent, and an energy modeler. Looking for advice on who is the appropriate author of such a plan.