Building Envelope Cx Checklist for LEED Documentation

NC-v4 EAc1:Enhanced commissioning
posted by  Joyce Kelly  on 

I am currently developing a Building Envelope Cx Checklist for LEED v3 projects.

8
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Thu Nov 10, 2016, 2:49 pm

OPTION 2. ENVELOPE COMMISSIONING (2 POINTS)

NC-v4 EAc1:Enhanced commissioning
posted by  Ciaran McCabe  on 

Can anyone identify the range of Building Envelope seasonal tests that are required to satisfy Option 2. Is there a typical list of activities outlined by LEED.

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Thu Nov 10, 2016, 2:40 pm

Enhanced Cx - Submittal reviews - HVAC&R only?

NC-v4 EAc1:Enhanced commissioning
posted by  André Harms  on 

In reference to the V4 LEED Reference Guide for Building Design and Construction, Enhanced Commissioning section: In the Step-by-Step guidance, “Step 4.

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Fri Sep 2, 2016, 4:01 pm

ASHREA 0-2005

NC-v4 EAc1:Enhanced commissioning
posted by  Amrit Kaur  on 

Any one knows where I can get the referenced 0-2005 standard? officially its no longer available from ASHREA and superseded by 0-2013. Any idea how different they may be?

2
Regional Director
Horizon Engineering Associates
LEEDuser Premium Member
40 thumbs up
Fri Sep 2, 2016, 3:52 pm

Enhanced and Fundamental Comissioning

NC-v4 EAc1:Enhanced commissioning
posted by  Isabel Santos  on 

Dear all, Regarding the Commissioning Authority, if aiming to do Enhanced Commissioning, can the CxA be part of the LEED Consultant team, considering that the team has been involved in providing c

3
Mon Aug 29, 2016, 10:16 pm

Non potable water systems

NC-v4 EAc1:Enhanced commissioning
posted by  Gustavo De las Heras Izquierdo  on 

Does anyone know if non-potable systems are included in the scope of this credit? I am referring to gray water, stormwater, water treatment plant and irrigation systems. Thanks

9
Default Avatar
Sustainability Consultant
NORESCO
LEEDuser Basic Member
3 thumbs up
Wed Aug 24, 2016, 5:05 pm

Separate MEP CxA and BECxA

NC-v4 EAc1:Enhanced commissioning
posted by  Annalise Reichert  on 

I am working on a project that is pursuing both Monitoring-based Commissioning and Building Envelope Commissioning.

3
Wed Apr 15, 2015, 2:22 am

Envelope Commissioning for a Major Renovation

NC-v4 EAc1:Enhanced commissioning
posted by  Eleni Tsivitzi  on 

Does anyone have experience doing envelope commissioning for an existing building? The project will be a Major Renovation with fairly extensive HVAC upgrades.

3
LEED Fellow
Integrated Design + Energy Advisors, LLC
LEEDuser Expert
377 thumbs up
Thu Feb 26, 2015, 9:20 pm