handling overflow

ND-v2009 GIBc8:Rainwater management
posted by  Crystal Wu  on 

As per LEED requirements in this credit, up to X percentile rainfall events should be retained on-site, through infiltration, evapotranspiration and reuse, and must not be discharged into surface w

1
Tue Mar 12, 2013, 5:58 pm

Existing constructions and non infiltration water tanks

ND-v2009 GIBc8:Rainwater management
posted by  Noriko Nagazumi  on 

Hello. Two questions: Are existing constructions required to be part of the project stormwater management? The reference book wording refers to "management plan for the project".

3