Construction IAQ management plan - before occupancy
Filter by location
Forum
Topic
Replies
Recent

Additional Flush-out Duration after Air Test Failed

Healthcare-v2009 IEQc3.2:Construction IAQ management plan - before occupancy
posted by  Kim Lombard  on 

If Option 2 for an air test fails, the remedy is .... "....conduct an additional flush-out with outside air and retest the noncompliant concentrations. Repeat until all requirements are met.

2
Wed May 10, 2017, 6:50 pm

Number of testing point

Healthcare-v2009 IEQc3.2:Construction IAQ management plan - before occupancy
posted by  Emil Andersson  on 

Hi. The credit language states that the number of sampling locations will depend on the size of the building and the number of ventilation systems.

5
Fri May 31, 2013, 9:03 am