LEED Site Boundary - Campus - easement for utilities
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Michele Helou on
'The LEED project boundary must include .......all land that was or will be disturbed for the purpose of undertaking the LEED project.' What if a small section an adjacent campus parking lot that
LEED Boundary on large site multiple buildings - 1 certifiable
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Alexander Clark on
I have a project that is on a 50 acre site that will be all developed. The project will have (7) structures on the site.
Airport Terminal LEED certification
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by KONSTANTINOS VAVALETSKOS on
In an airport LEED project, only the terminal building is going to be certified. In this case how the LEED Boundary should be defined?
non certifiable building
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by renee jimenez on
what is the definition of a non-LEED-certifiable building? does it mean your not going to attempt to certify them or that they dont qualify/meet minimum requirements?
LEED Boundary with a NON Certified Building within it?
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Sonia M. Miranda Palacios on
Hi all. I have a LEED Certifiable Building (C&S V.3) within a site, that will also have a NON certified building within it.
School addition - LEED Boundary
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by padraic o connell on
Hi all, Our project is an addition to a school - LEED NC.
renovation and addition: effect on site boundary
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Ramana Koti on
Dear all, We're working on a project that renovates a tiny portion (interior fit out only) of an existing building and involves an addition right next to the renovated portion.
LEED certification separate or whole?
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Qiang Zhang on
A campus have several projects, and 4 of the projects are connected with sidewalk/spatial corridors, seems a whole building, but they have different functions, in this situation, can we still certi
excluding part of the site from the LEED Boundary
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Ann Plautz on
I am working on a project where the LEED Boundary had already been set prior to my participation. The project is a Streetcar Vehicle maintenance facility owned on a City block owned by a City.
LEED v3 Campus Deadline
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Patrice McVeigh on
We are working on a project with 4 office buildings and a multi-storey car park. We are unsure whether to go for campus certification as the project is phased.