JOSE R. TAGLE
COMMISSIONING & LEED
AKF GROUP
LEEDuser Basic Member
2 thumbs up
“We have a project (North Tower) within the site of a project (South Tower), same owner, but each project would have their own certification.
I'm working on a project located in high density urban area which means 100% of the site can be built in the ground floor. How do i have to calculate 25% in this case?